July 31, 2018
Kerja-kerja pembinaan tukup cerucuk di tapak Stesen MRT Kuchai Lama.

Jalan Kuchai Lama (Kuchai Lama)

Pile cap construction works at the Kuchai Lama MRT Station site.
July 31, 2018
Kerja-kerja pemasangan rangka menara untuk pelancaran rasuk berbentuk T untuk aras ruang legar Stesen MRT 16 Sierra

Persiaran Sierra Utama (16 Sierra)

Trestle tower assembly works for the T-beam launching for the 16 Sierra MRT Station concourse level.
July 31, 2018
Pandangan udara kerja-kerja cerucuk kepingan dan peningkatan saliran sepanjang Persiaran Alpinia menuju ke tapak Stesen MRT 16 Sierra.

Persiaran Alpinia (16 Sierra)

Aerial view of sheet piling and drainage enhancing works along Persiaran Alpinia towards the 16 Sierra MRT Station site.
July 31, 2018
Pandangan udara kerja-kerja pembinaan cerucuk gerek dan tiang di tapak Stesen MRT Sri Delima.

Jalan Kepong (Sri Delima)

Aerial view of bored piling works and piers construction at the Sri Delima MRT Station site.
July 31, 2018
Pemasangan rasuk berbentuk T di tapak Stesen MRT Jinjang.

Jalan Kepong (Jinjang)

Installation of T-beam for the Jinjang MRT Station.
July 31, 2018
Pandangan udara pembinaan tiang di tapak Stesen MRT Taman Putra Permai.

Taman Putra Permai

Aerial view of pier columns construction at the Taman Putra Permai MRT Station site.
June 30, 2018
Pembinaan tiang di tapak Stesen MRT Kepong Sentral.

Jalan Kepong (Kepong Sentral)

Aerial view of bored piles, pile caps, pier columns and station crosshead works at the Kepong Sentral MRT Station site.
June 30, 2018
Pelancaran Galang Kekotak Bersegmen di tapak Stesen MRT Serdang Raya North.

Jalan Serdang Raya South (Serdang Raya South)

Segmental Box Girder launching at the Serdang Raya North MRT Station site.
June 30, 2018
Pandangan udara kerja-kerja tiang di jajaran berdekatan dengan Kampung Malaysia Raya.

Kampung Malaysia Raya

Aerial view of pier works at the alignment near Kampung Malaysia Raya.