August 31, 2019
Pandangan udara rentang yang telah siap dibina di tapak Stesen MRT Taman Equine

Equine Park

Aerial view of completed spans at the Equine Park MRT Station site.
August 31, 2019
Kerja-kerja pembinaan aras tengah Stesen MRT UPM sedang berjalan.

Jalan UPM (UPM)

UPM MRT Station intermediate level construction works in progress.
August 31, 2019
Pandangan udara rentang yang telah siap di tapak Stesen MRT Taman Putra Permai.

Taman Putra Permai

Aerial view of completed spans at the Taman Putra Permai MRT Station site.
August 31, 2019
Pandangan udara tapak Stesen MRT 16 Sierra menunjukkan pemasangan penutup bumbung stesen sedang dijalankan.

Persiaran Sierra Utama (16 Sierra)

Aerial view of the 16 Sierra MRT Station site showing the installation of station roof covered in progress.
August 31, 2019
Pandangan udara Stesen MRT Cyberjaya City Centre menunjukkan ruang legar dan aras tengah yang telah siap dan platform untuk rasuk pasca tegangan sedang dijalankan.

Persiaran APEC (Cyberjaya City Centre)

Aerial view of the Cyberjaya City Centre MRT Station showing the completed concourse and intermediate level while platform for post tensioning beam in progress.
August 31, 2019
Pandangan udara kerja-kerja pemasangan parapet dan penggantung kabel telah siap di persilangan Lebuhraya Putrajaya-Cyberjaya.

Putrajaya-Cyberjaya Expressway

Aerial view of the completed installation works for parapet and cable hanger at the crossing Putrajaya-Cyberjaya Expressway.
August 31, 2019
Pandangan udara Stesen MRT Putrajaya Sentral menunjukkan ruang legar dan aras tengah yang telah siap dan platform untuk rasuk pasca tegangan dan kerja-kerja blok sedang dijalankan.

Putrajaya Sentral

View of the Putrajaya Sentral MRT Station showing the completed concourse and intermediate level while platform for post tensioning beam and block works in progress.
July 31, 2019
Kerja-kerja persediaan penekanan tendon di jajaran berhampiran tanjakan ke Tol Sungai Buloh.

PLUS Highway (Sg Buloh Toll)

Ongoing preparation works for tendon stressing at the alignment near ramp to Sungai Buloh Toll
July 31, 2019
Kerja-kerja pembinaan jambatan akses sedang dijalankan di tapak Stesen MRT Damansara Damai.

Jalan Kuala Selangor (Damansara Damai)

Access bridge construction works in progress at the Damansara Damai MRT Station site.