Pandangan udara pelancaran galang kekotak bersegmen untuk rentang piawai telah siap di persilangan Lebuhraya Putrajaya-Cyberjaya.

Putrajaya-Cyberjaya Expressway

Aerial view of the segmental box girder launching for standard span completed at the crossing Putrajaya-Cyberjaya Expressway.
July 31, 2019
Pelancaran galang kekotak bersegmen kekotak stesen telah siap di tapak Stesen MRT Putrajaya Sentral.

Putrajaya Sentral

Station box segmental box girder launching completed at the Putrajaya Sentral MRT Station site.
June 30, 2019
Kerja-kerja pembinaan segmen untuk lintasan rentang panjang berhampiran tanjakan ke Tol Sungai Buloh

PLUS Highway (Sg Buloh Toll)

Ongoing erection works for segment at the long span crossing near the ramp to Sungai Buloh Toll.
June 30, 2019
Pandangan udara kerja-kerja pembinaan papak landasan sedang dijalankan di tapak Stesen MRT Sri Damansara Barat.

Jalan Kuala Selangor (Sri Damansara West)

Aerial view of ongoing construction works of trackform slab at the Sri Damansara West MRT Station site.
June 30, 2019
Pandangan udara kerja-kerja pembinaan papak platform Stesen MRT Damansara Damai.

Jalan Kuala Selangor (Damansara Damai)

Aerial view of the construction of Damansara Damai MRT Station platform slab.
June 30, 2019
Pandangan udara kerja-kerja bumbung stesen di tapak Stesen MRT Sri Damansara Timur

Persiaran Dagang (Sri Damansara East)

Aerial view of station roofing works at the Sri Damansara East MRT Station site.
June 30, 2019
Pandangan udara kerja-kerja pembinaan rasuk dan papak sedang dijalankan di aras platform Stesen MRT Kepong Sentral.

Jalan Kepong (Kepong Sentral)

Aerial view of the ongoing construction works for beam and slab at Kepong Sentral MRT Station platform level.
June 30, 2019
Pandangan udara kerja-kerja pelancaran galang kekotak bersegmen bagi lintasan rentang panjang no 4 siap dengan kerja-kerja sambungan sedang dijalankan di jajaran bawah MRR2.

Jalan Kepong (MRR2)

Aerial view of the completed launching works segmental box girder for long span crossing 4 while stitching works in progress at the alignment underneath MRR2
June 30, 2019
Pandangan tapak Stesen MRT Kepong Baru menunjukkan kerja-kerja kemasan seni bina sedang dijalankan seperti pemasangan mukaan stesen di kedua-dua bahagian kekotak stesen.

Jalan Kepong (Kepong Baru)

View of the Kepong Baru MRT Station site showing ongoing architectural finishes works such as installation of station’s façade at both side of the station box.