January 31, 2020
Kerja-kerja bumbung sedang dijalankan di tapak Stesen MRT Cyberjaya City Centre.

Persiaran APEC (Cyberjaya City Centre)

Ongoing roofing works at the Cyberjaya City Centre MRT Station site.
January 31, 2020
Pandangan udara tapak Stesen MRT Putrajaya Sentral menunjukkan pembinaan struktur besi sedang dijalankan.

Putrajaya Sentral

Aerial view of the Putrajaya Sentral MRT Station site showing the steel structure erection in progress.
December 31, 2019
Pemasangan struktur dan perlindungan bumbung sudah 85% siap. Kerja-kerja luaran stesen seperti dinding penahan dan kerja-kerja saliran sedang dijalankan di Stesen MRT Metro Prima.

Jalan Kepong (Metro Prima)

Installation of roof structure and covering are 85% completed. External works outside the station such as retaining wall and drainage works are in progress at the Metro Prima MRT Station.
December 31, 2019
Pengurungan kabel mekanikal dan elektrikal di Pintu A dan B sedang dijalankan di tapak Stesen MRT Damansara Damai.

Jalan Kuala Selangor (Damansara Damai)

Electrical and Mechanical cable containment in progress at the Entrance A and B of the Damansara Damai MRT Station site
December 31, 2019
Pemasangan struktur besi sedang dijalankan di Pintu A dan B dan pengurungan kabel mekanikal dan elektrikal di Kekuda 1 Stesen MRT Sri Damansara Barat

Jalan Kuala Selangor (Sri Damansara Barat)

Installation of steel structure in progress at the Entrance B and Electrical and Mechanical cable containment at the Truss 1 of the Sri Damansara Barat MRT Station.
December 31, 2019
Pemasangan dinding permukaan berkembar dan kaca lif sedang dijalankan di Stesen MRT Sri Damansara Sentral.

Persiaran Dagang (Sri Damansara Sentral)

Installations of double skin wall and lift glass in progress at the Sri Damansara Sentral MRT Station.
December 31, 2019
Pemasangan struktur dan perlindungan bumbung sudah siap 75%. Kerja-kerja luaran seperti dinding penahan, kerja-kerja jalan dan kerja-kerja saliran sedang dijalankan di Stesen MRT Sri Damansara Timur.

Jalan Kepong (Sri Damansara Timur)

Installation of roof structure and covering are 75% completed. External works such as retaining wall, roadworks and drainage works are in progress at the Sri Damansara Timur MRT Station.
December 31, 2019
Pandangan udara Stesen MRT Kepong Baru menunjukkan kerja-kerja luaran seperti dinding penahan dan kerja-kerja saliran sedang dijalankan.

Jalan Kepong (Kepong Baru)

Aerial view of the Kepong Baru MRT Station showing external works such as retaining wall and drainage works in progress.
December 31, 2019
Pemasangan struktur dan perlindungan bumbung sudah siap 60%. Kerja-kerja luaran seperti dinding penahan, kerja-kerja jalan dan kerja-kerja saliran sedang dijalankan di Stesen MRT Jinjang.

Jalan Kepong (Jinjang)

Installation of roof structure and covering are 60% completed. External works such as retaining wall, roadworks and drainage works are in progress at the Jinjang MRT Station.