October 31, 2019
Persediaan untuk kerja-kerja penggalian sedang dijalankan di laluan bawah berhampiran Lebuhraya KL-Seremban, hala utara.z

KL-Seremban Highway

Preparation for excavation works in progress at the underpass near the KL-Seremban Highway, north bound.
October 31, 2019
tanah tapak Stesen MRT Sungai Besi menunjukkan kerja-kerja stesen sedang dijalankan.

Jalan Sungai Besi (Sungai Besi)

Ground view of the Sungai Besi MRT Station site showing the station works in progress
October 31, 2019
Pandangan udara tapak Stesen MRT Serdang Raya Utara menunjukkan kerja-kerja pemasangan tembok sedang berjalan.

Jalan Serdang Raya (Serdang Raya North)

Aerial view of the Serdang Raya North MRT Station site showing the parapet installation works in progress.
October 31, 2019
Pandangan udara tapak Stesen MRT Seri Kembangan menunjukkan kerja-kerja pembinaan galang kekotak bersegmen sedang berjalan.

Seri Kembangan

Aerial view of Seri Kembangan MRT Station site showing the erection works for segmental box girder in progress.
October 31, 2019
Pandangan tanah Depoh Serdang menunjukkan bangunan pejabat pentadbiran dan kerja pengukuhan untuk rasuk bumbung sedang dijalankan.

Serdang Depot

Ground view of the Serdang Depot showing the administration office building and reinforcement work for roof slab in progress.
October 31, 2019
Pandangan udara tapak Stesen MRT Taman Equine menunjukkan rasuk aras tengah yang telah siap dan sokongan sementara untuk aras platform sedang dijalankan.

Equine Park

Aerial view of the Equine Park MRT Station site showing the completed intermediate level slab while temporary support to platform level in progress.
October 31, 2019
Pandangan udara rasuk aras ruang legar sedang dijalankan di tapak Stesen MRT Taman Putra Permai.

Taman Putra Permai

Aerial view of ongoing concourse level slab at the Taman Putra Permai MRT Station site.
October 31, 2019
Pandangan udara tapak Stesen MRT 16 Sierra menunjukkan pemasangan lapik bumbung lapisan terakhir dan Pintu Masuk 2 sedang dijalankan.

Persiaran Sierra Utama (16 Sierra)

Aerial view of the 16 Sierra MRT Station site showing the final layer and Entrance 2 roof covering installations in progress.
October 31, 2019
Kerja-kerja bongkah aras ruang legar sedang dijalankan di tapak Stesen MRT Cyberjaya Utara.

Persiaran APEC (Cyberjaya North)

Ongoing concourse level blockworks at the Cyberjaya North MRT Station site.