Project Updates

The Sungai Buloh-Serdang-Putrajaya Line Project Updates provides the latest project construction progress updates based on the type of alignment and location of the sites. You may also view the locations and status of project from our Project Interactive Map.

Sungai Besi Air Force Base (Bandar Malaysia North)

30 September 2019

View of the installation of ring beam in the tunnel between Bandar Malaysia Nort…

PLUS Highway (Sg Buloh Toll)

30 September 2019

Aerial view of the completed long span crossing viaduct at the alignment near ra…

Jalan Kuala Selangor (Damansara Damai)

30 September 2019

Aerial view of Damansara Damai MRT Station external works preparation in progres…

Jalan Kuala Selangor (Sri Damansara West)

30 September 2019

Aerial view of station roofing works in progress at the Sri Damansara West MRT S…

Persiaran Dagang (Sri Damansara East)

30 September 2019

Sri Damansara East MRT Station trackfrom casting is completed.…

Jalan Kepong (Kepong Sentral)

30 September 2019

View of installation of steel structure frames and micropiles for stations’ en…

Jalan Kepong (Kepong Baru)

30 September 2019

Aerial view of the completed installation of roof and façade for station box, E…

Jalan Kepong (Jinjang)

30 September 2019

Aerial view of Jinjang MRT Station with completed permanent diversion of monsoon…

Jalan Kuching

30 September 2019

Aerial view showing completed parapets installation works at the alignment cross…

Jalan Kepong (Sri Delima)

30 September 2019

Aerial view showing ongoing casting works for the Sri Delima MRT Station lift.…

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

30 September 2019

Aerial view of the cut and cover works at Escape Shaft 1 site.…

Jalan Tun Razak (Titiwangsa)

30 September 2019

View of the roof level infill slab formwork table installation at the Titiwangsa…

Jalan Tun Razak (Hospital Kuala Lumpur)

30 September 2019

Night view of Hospital Kuala Lumpur MRT Station site showing reinforced concrete…

Jalan Tun Razak (Intervention Shaft 1)

30 September 2019

View of the ongoing dismantling of tunnel boring machine after breakthrough at t…

Jalan Raja Muda Abdul Aziz (Kampung Baru North)

30 September 2019

Aerial view of the excavation of diaphragm wall starting at Entrance A of the Ka…