August 31, 2019
Pandangan udara kemajuan pembinaan persilangan rentang panjang di jajaran berhampiran tanjakan ke Tol Sungai Buloh.

PLUS Highway (Sg Buloh Toll)

Aerial view of the progress for the construction of long span crossing at the alignment near ramp to Sungai Buloh Toll.
August 31, 2019
Pandangan udara kerja-kerja seni bina dan struktur Stesen MRT Damansara Damai sedang berjalan.

Jalan Kuala Selangor (Damansara Damai)

Aerial view of Damansara Damai MRT Station architectural and structural works in progress.
August 31, 2019
Pandangan udara pemasangan kekasau stesen sedang dijalankan di tapak Stesen MRT Sri Damansara Barat.

Jalan Kuala Selangor (Sri Damansara West)

Aerial view of station rafter installation in progress at the Sri Damansara West MRT Station site.
August 31, 2019
Pandangan udara kerja-kerja seni bina dan struktur stesen sedang dijalankan di tapak Stesen MRT Sri Damansara Timur

Persiaran Dagang (Sri Damansara East)

Aerial view of station architectural and structural works at the Sri Damansara East MRT Station site.
August 31, 2019
Pandangan udara kerja-kerja telah siap untuk pelancaran galang kekotak bersegmen akhir menggunakan gantri pelancar di jajaran berhampiran MRR2.

Jalan Kepong (MRR2)

Aerial view of works completed for final segmental box girder launching using launching gantry at the alignment near MRR2.
August 31, 2019
Pandangan udara kerja-kerja pemasangan kerangka atas struktur besi sedang dijalankan di Stesen MRT Metro Prima. Kerja-kerja yang telah siap untuk rasuk, papak dan tiang di paras platform juga boleh dilihat.

Jalan Kepong (Metro Prima)

Aerial view of the installation works for steel structure upper frame in progress at the Metro Prima MRT Station. Completed works for beam, slab and column at the platform level can also be seen.
August 31, 2019
Kerja-kerja seni bina dan mekanikal dan elektrikal sedang dijalankan seperti pemasangan mukaan stesen, kekotak galang dan pembendungan kabel untuk stesen dan pintu masuk di tapak Stesen MRT Kepong Baru.

Jalan Kepong (Kepong Baru)

Ongoing architectural works and electrical and mechanical works such as installation of station façade, boombox and cable containment for station and entrances of the Kepong Baru MRT Station site.
August 31, 2019
Pandangan udara kerja-kerja pemasangan kerangka atas struktur besi dan pelitupan bumbung di Stesen MRT Jinjang. Kerja-kerja pembinaan rasuk dan papak yang sudah siap juga boleh kelihatan.

Jalan Kepong (Jinjang)

Aerial view of installation works for steel structure upper frame and roof covering works in progress at the Jinjang MRT Station. Completed beam and slab construction works can also be seen.
August 31, 2019
Pandangan udara menunjukkan kerja-kerja bumbung sedang dijalankan untuk Stesen MRT Sri Delima.

Jalan Kepong (Sri Delima)

Pandangan udara menunjukkan kerja-kerja bumbung sedang dijalankan untuk Stesen MRT Sri Delima.