May 31, 2019
Kerja-kerja pemasangan membran kalis air sedang berjalan di Syaf Kecemasan 3.

Jalan Peel (Escape Shaft 3)

Ongoing waterproofing membrane installation works at the Escape Shaft 3.
May 31, 2019
Pandangan mesin pengorek terowong sedang menggali dari tapak Stesen MRT Bandar Malaysia Utara menuju Portal Selatan

Sungai Besi Air Force Base (Bandar Malaysia North)

View of the tunnel boring machine mining from Bandar Malaysia North MRT Station site towards the South Portal.
May 31, 2019
Pandangan udara pemasangan gantri pelancar dan kerja-kerja pelancaran rasuk berbentuk T di tapak Stesen MRT Kuchai Lama.

Jalan Kuchai Lama (Kuchai Lama)

Aerial view of the assembly of launching gantry and T-beam launching works in progress at the Kuchai Lama MRT Station site.
May 31, 2019
Pelancaran galang kekotak bersegmen dan kerja-kerja ruang legar stesen sedang dijalankan di tapak Stesen MRT Taman Naga Emas.

Taman Naga Emas

Ongoing launching of segmental box girder and station concourse works at the Taman Naga Emas MRT Station site.
May 31, 2019
Pandangan udara kerja-kerja terowong mikro sedang dijalankan di laluan bawah berhampiran Lebuhraya KL-Seremban.

KL-Seremban Highway

Aerial view of ongoing micro tunnelling works at the underpass near the KL-Seremban Highway.
May 31, 2019
Pandangan kerja-kerja pembinaan kepala tiang bersegmen rasuk sesilang ruang legar dan pembinaan galang kekotak bersegmen di tapak Stesen MRT Sungai Besi.

Jalan Sungai Besi (Sungai Besi)

View of the construction works for concourse cross beam segmental pier head as well as erection works for segmental box girder at the Sungai Besi MRT Station site.
May 31, 2019
Kerja-kerja pembinaan sedang dijalankan untuk kepala tiang berbentuk T dan galang kekotak bersegmen di tapak Stesen MRT Serdang Raya Utara.

Jalan Serdang Raya (Serdang Raya North)

Ongoing construction works for T-shape pier head and segmental box girder erection at the Serdang Raya North MRT Station site.
May 31, 2019
Pembinaan tiang di tiang kepala tukul di tapak Stesen MRT Serdang Raya Selatan.

Jalan Serdang Raya (Serdang Raya South)

Column construction at hammer head pier at the Serdang Raya South MRT Station site.
May 31, 2019
Kerja-kerja berterusan untuk pembinaan kepala sesliang dan struktur bangunan utiliti di tapak Stesen MRT Seri Kembangan.

Seri Kembangan

Ongoing works for crosshead erection and utility building structure at the Seri Kembangan MRT Station site.