January 31, 2020
Pemasangan kerangka besi untuk aktiviti lapisan sementara di laluan bawah berhampiran Lebuhraya KL-Seremban.

KL-Seremban Highway

Installation of steel rib for temporary lining activity at the underpass near the KL-Seremban Highway.
January 31, 2020
Pandangan udara pemasangan penggantung kabel sedang dijalankan di Stesen MRT Serdang Raya Utara.

Jalan Serdang Raya (Serdang Raya Utara)

Aerial view of the installation of cable hanger in progress at the Serdang Raya Utara MRT Station
January 31, 2020
Pandangan udara pembinaan bumbung Stesen MRT Serdang Raya Selatan sedang dijalankan.

Jalan Serdang Raya (Serdang Raya Selatan)

Long span crossing and launching works in progress at the alignment crossing Jalan Besar between Serdang Raya Selatan MRT Station and Serdang Jaya MRT Station.
January 31, 2020
Kerja-kerja seni bina sedang dijalankan di aras ruang legar Stesen MRT Serdang Jaya.

Serdang Jaya

Architecture works in progress at the Serdang Jaya MRT Station concourse level.
January 31, 2020
Pandangan tapak Stesen MRT UPM menunjukkan kerja-kerja bumbung sedang dijalankan.

Jalan UPM (UPM)

View of the UPM MRT Station site showing the roofing works in progress.
January 31, 2020
Pandangan udara Depoh Serdang menunjukkan bengkel infrastruktur, kerja-kerja mengecat, pemasangan rel tangan boleh alih, kerja-kerja aplikasi epoksi dan pemasangan kaca gelas dan pintu sedang dijalankan.

Serdang Depot

Aerial view of the Serdang Depot showing the infrastructure workshop, painting works, installation of removable handrailing, application epoxy works and installation of glass windows and doors in progress.
January 31, 2020
Pandangan udara Stesen MRT Taman Equine menunjukkan kerja-kerja stesen dan kerja-kerja blok seni bina untuk kerja-kerja bilik sistem sedang dijalankan.

Taman Equine

Aerial view of the Taman Equine MRT Station showing the station works and architecture blockworks for system rooms works in progress.
January 31, 2020
Kerja-kerja stesen dan kerja-kerja papak tengah sedang dijalankandi Stesen MRT Putra Permai

Putra Permai

Station works and intermediate slab works in progress at the Putra Permai MRT Station.
January 31, 2020
Pandangan udara tapak Stesen MRT Cyberjaya Utara menunjukkan papak aras platform sudah siap dan kerja-kerja tuangan sedang dijalankan.

Persiaran APEC (Cyberjaya Utara)

Aerial view of the Cyberjaya Utara MRT Station site showing the platform level slab completed and casting works in progress.