July 31, 2018
Pandangan udara kerja-kerja rasuk portal dan pelancaran gantri pelancar di tapak Stesen MRT Taman Naga Emas.

Taman Naga Emas

Aerial view of the portal beam works and erection of launching gantry at the Taman Naga Emas MRT Station site.
July 31, 2018
Pandangan udara pelancaran galang kekotak bersegmen berdekatan dengan IGB International School.

Jalan Kuala Selangor (IGB International School)

Aerial view of segmental box girder launch near IGB International School.
July 31, 2018
Persediaan untuk pelancaran galang kekotak bersegmen di tapak Stesen MRT Kampung Batu.

Jalan Kampung Batu (Kampung Batu)

Preparation for segmental box girder launch at the Kampung Batu MRT Station site.
July 31, 2018
Kerja-kerja pembinaan tukup cerucuk di tapak Stesen MRT Kuchai Lama.

Jalan Kuchai Lama (Kuchai Lama)

Pile cap construction works at the Kuchai Lama MRT Station site.
July 31, 2018
Kerja-kerja pemasangan rangka menara untuk pelancaran rasuk berbentuk T untuk aras ruang legar Stesen MRT 16 Sierra

Persiaran Sierra Utama (16 Sierra)

Trestle tower assembly works for the T-beam launching for the 16 Sierra MRT Station concourse level.
July 31, 2018
Pandangan udara kerja-kerja cerucuk kepingan dan peningkatan saliran sepanjang Persiaran Alpinia menuju ke tapak Stesen MRT 16 Sierra.

Persiaran Alpinia (16 Sierra)

Aerial view of sheet piling and drainage enhancing works along Persiaran Alpinia towards the 16 Sierra MRT Station site.
July 31, 2018
Pandangan udara kerja-kerja pembinaan cerucuk gerek dan tiang di tapak Stesen MRT Sri Delima.

Jalan Kepong (Sri Delima)

Aerial view of bored piling works and piers construction at the Sri Delima MRT Station site.
July 31, 2018
Pemasangan rasuk berbentuk T di tapak Stesen MRT Jinjang.

Jalan Kepong (Jinjang)

Installation of T-beam for the Jinjang MRT Station.
July 31, 2018
Pandangan udara pembinaan tiang di tapak Stesen MRT Taman Putra Permai.

Taman Putra Permai

Aerial view of pier columns construction at the Taman Putra Permai MRT Station site.