January 31, 2019
Penyiapan pembinaan galang kekotak bersegmen menggunakan kaedah tresel di jajaran laluan Sungai Buloh-Serdang-Putrajaya berhampiran dengan Sekolah Antarabangsa IGB.

Jalan Kuala Selangor (IGB International School)

Completion of segmental box girder erection using trestle at the Sungai Buloh-Serdang-Putrajaya Line alignment near IGB International School.
January 31, 2019
Pembinaan galang kekotak bersegmen sedang dijalankan bagi lintasan rentang panjang no. 1 di Sungai Gasi berhampiran Plaza Tol Sungai Buloh.

PLUS Highway (Sg Buloh Toll)

Segmental box girder erection for long span crossing no. 1 in progress at Sungai Gasi near the Sungai Buloh Toll
January 31, 2019
Kerja-kerja pemasangan kekuda bumbung sedang dijalankan di tapak Stesen MRT Damansara Damai.

Jalan Kuala Selangor (Damansara Damai)

Ongoing roof truss installation works at the Damansara Damai MRT Station site.
January 31, 2019
Kerja-kerja persediaan pelancar Rasuk berbentuk T sedang dijalankan di tapak Stesen MRT Sri Damansara Barat

Jalan Kuala Selangor (Sri Damansara West)

Preparation of T-Beam launching in progress at the Sri Damansara West MRT Station site.
January 31, 2019
Pembinaan galang kekotak bersegmen bagi lintasan panjang No.3 di persilangan antara LDP, DUKE dan MRR2 berhampiran dengan tapak Stesen MRT Sri Damansara Timur

Persiaran Dagang (Sri Damansara East)

Segmental Box Girder erection for long span crossing no.3 at the LDP, DUKE and MRR2 interchange near Sri Damansara East MRT Station site.
January 31, 2019
Pandangan udara pelancaran galang kekotak bersegmen sedang dijalankan di tapak Stesen Kepong Sentral. Kelihatan juga kerja-kerja pembinaan dinding peparit, rasuk dan papak bagi aras bawah di Pencawang Kuasa Tarikan.

Jalan Kepong (Kepong Sentral)

Aerial view of segmental box girder launching in progress at the Kepong Sentral MRT Station site. Also seen is the construction works for trench wall, beam and slab for the ground level at Traction Power Substation.
January 31, 2019
Kerja-kerja pembinaan sedang dijalankan bagi rasuk, papak dan tiang di aras ruang legar dan perantaraan Stesen MRT Metro Prima.

Jalan Kepong (Metro Prima)

Ongoing construction works of beam, slab and column at the concourse and intermediate level of Metro Prima MRT Station.
January 31, 2019
Penyiapan pemasangan struktur besi untuk bumbung dan juga pembinaan kekotak stesen bagi aras platform sedang dijalankan di tapak Stesen MRT Kepong Baru.

Jalan Kepong (Kepong Baru)

Aerial view of the completed steel structure installation for the roof. Also in view is the ongoing construction of station platform level at the Kepong Baru MRT Station site.
January 31, 2019
Kerja-kerja pembinaan sedang berjalan di Stesen MRT Jinjang untuk pelancaran galang kekotak bersegmen menggunakan kaedah tresel dan pemasangan penghadang bunyi.

Jalan Kepong (Jinjang)

Works in progress at the Jinjang MRT Station for the segmental box girder launching using trestle method and installation of noise barrier.