January 31, 2019
Kerja-kerja pembinaan sedang dijalankan bagi rasuk, papak dan tiang di aras ruang legar dan perantaraan Stesen MRT Metro Prima.

Jalan Kepong (Metro Prima)

Ongoing construction works of beam, slab and column at the concourse and intermediate level of Metro Prima MRT Station.
January 31, 2019
Penyiapan pemasangan struktur besi untuk bumbung dan juga pembinaan kekotak stesen bagi aras platform sedang dijalankan di tapak Stesen MRT Kepong Baru.

Jalan Kepong (Kepong Baru)

Aerial view of the completed steel structure installation for the roof. Also in view is the ongoing construction of station platform level at the Kepong Baru MRT Station site.
January 31, 2019
Kerja-kerja pembinaan sedang berjalan di Stesen MRT Jinjang untuk pelancaran galang kekotak bersegmen menggunakan kaedah tresel dan pemasangan penghadang bunyi.

Jalan Kepong (Jinjang)

Works in progress at the Jinjang MRT Station for the segmental box girder launching using trestle method and installation of noise barrier.
January 31, 2019
Kerja-kerja penyiapan untuk pembinaan tiang di jajaran menyeberangi Jalan Kuching di Stesen MRT Sri Delima.

Jalan Kepong (Sri Delima)

Finishing works of pier construction for the alignment crossing Jalan Kuching at the Sri Delima MRT Station
January 31, 2019
Kerja-kerja pembinaan tukup cerucuk sedang berjalan di sepanjang Jalan Ipoh berdekatan tapak Stesen MRT Kentomen.

Jalan Ipoh (Kentonmen)

Pile cap construction works in progress along Jalan Ipoh near the Kentonmen MRT Station site.
January 31, 2019
Kerja-kerja cerucuk gerek sekan sedang dijalankan di hadapan Kompleks Mutiara untuk Stesen MRT Jalan Ipoh.

Jalan Ipoh (Jalan Ipoh)

Ongoing secant bore piling works in front of Mutiara Complex for Jalan Ipoh MRT Station.
January 31, 2019
Kerja-kerja tanah sedang dijalankan di tapak Stesen MRT Conlay.

Jalan Conlay (Conlay)

Ongoing earthwork at Conlay MRT Station site.
January 31, 2019
Kerja-kerja pemasangan rebar sedang berjalan di tapak Syaf Penyelenggaraan 2.

Kampung Pandan Roundabout (Intervention Shaft 2)

Erection of rebar works in progress at the Intervention Shaft 2 site.
January 31, 2019

Jalan Peel (Escape Shaft 3)

Ongoing curing works as well as dismantling formwork activities at the Escape Shaft 3 site.