July 31, 2019
Pandangan keseluruhan Depoh Serdang menunjukkan kawasan simpanan tren (kiri), bangunan kereta api (tengah) dan bangunan bengkel infra (kanan).

Serdang Depot

Overall view of the Serdang Depot showing the stabling yard (left), rolling stock building (middle) and infra workshop building (right).
July 31, 2019
Pandangan udara pembinaan aras tengah Stesen MRT Taman Equine sedang dijalankan.

Equine Park

View of the parapet wall installation in progress at the Equine Park MRT Station site.
July 31, 2019
Kerja-kerja pelancaran sedang dijalankan untuk galang kekotak bersegmen ke laluan arah selatan menuju ke tapak Stesen MRT Taman Putra Permai.

Taman Putra Permai

Ongoing launching works for segmental box girder to southbound line towards Taman Putra Permai MRT Station site.
July 31, 2019
Pandangan pemasangan kekuda stesen struktur besi di tapak Stesen MRT 16 Sierra.

Persiaran Sierra Utama (16 Sierra)

View of the installation of steel structure station truss at the 16 Sierra MRT Station site.
July 31, 2019
Pandangan kerja-kerja pemasangan dinding parapet dan penghadang bunyi sedang dijalankan di tapak Stesen MRT Cyberjaya Utara.

Persiaran APEC (Cyberjaya North)

View of the parapet wall and noise barrier installation works in progress at the Cyberjaya North MRT Station site.
July 31, 2019
Pandangan udara papak platform Stesen MRT Cyberjaya City Centre sedang dibina.

Persiaran APEC (Cyberjaya City Centre)

Aerial view of the Cyberjaya City Centre MRT Station platform slab in progress.
July 31, 2019
Pandangan udara pelancaran galang kekotak bersegmen untuk rentang piawai telah siap di persilangan Lebuhraya Putrajaya-Cyberjaya.

Putrajaya-Cyberjaya Expressway

Aerial view of the segmental box girder launching for standard span completed at the crossing Putrajaya-Cyberjaya Expressway.
July 31, 2019
Pelancaran galang kekotak bersegmen kekotak stesen telah siap di tapak Stesen MRT Putrajaya Sentral.

Putrajaya Sentral

Station box segmental box girder launching completed at the Putrajaya Sentral MRT Station site.
June 30, 2019
Kerja-kerja pembinaan segmen untuk lintasan rentang panjang berhampiran tanjakan ke Tol Sungai Buloh

PLUS Highway (Sg Buloh Toll)

Ongoing erection works for segment at the long span crossing near the ramp to Sungai Buloh Toll.