June 30, 2020
Kerja-kerja konkrit tetulang dan besi sedang dijalankan di tapak Stesen MRT Serdang Raya Utara.

Jalan Serdang Raya (Serdang Raya Utara)

Reinforced Concrete and steel works in progress at the Serdang Raya Utara MRT Station site.
June 30, 2020
Kerja-kerja pemasangan kepingan bumbung sedang dijalankan di tapak Stesen MRT Serdang Raya Selatan.

Jalan Serdang Raya (Serdang Raya Selatan)

Roof sheet installation works in progress at the Serdang Raya Selatan MRT Station site.
June 30, 2020
Pandangan udara tapak Stesen MRT Serdang Jaya menunjukkan kerja-kerja pemasangan sesangga besi dan kekuda bawah sedang dijalankan.

Serdang Jaya

Aerial view of the Serdang Jaya MRT Station site showing the steelwork corbel and lower truss installation in progress.
June 30, 2020
Kerja-kerja pemasangan aksesori bumbung sedang dijalankan di Stesen MRT UPM.

Jalan UPM (UPM)

Ongoing roof accessories installation works in progress at the UPM MRT Station.
June 30, 2020
Pembinaan struktur besi di jejantas sedang dijalankan di Depoh Serdang

Serdang Depot

Steel structure erection at overhead bridge in progress at the Serdang Depot
June 30, 2020
Kerja-kerja seni bina dan kerja-kerja mekanikal dan elektrikal sedang dijalankan untuk semua bilik sistem Stesen MRT Taman Equine.

Taman Equine

Architectural works and electrical and mechanical works in progress for all system rooms of the Taman Equine MRT Station.
June 30, 2020
andangan udara tapak Stesen MRT Putra Permai menunjukkan kerja-kerja platform sedang dijalankan.

Putra Permai

Aerial view of the Putra Permai MRT Station site showing the ongoing platform works.
June 30, 2020
Pandangan udara Stesen MRT 16 Sierra menunjukkan kerja-kerja pemasangan penutup bumbung sedang dijalankan

Persiaran Sierra Utama (16 Sierra)

Aerial view of the 16 Sierra MRT Station showing the roof covered installation in progress.
June 30, 2020
Kerja-kerja pelapik bumbung dan pemasangan kekotak bunyi platform sedang dijalankan di tapak Stesen MRT Cyberjaya Utara.

Persiaran APEC (Cyberjaya Utara)

Roof covered and platform boombox installation in progress at the Cyberjaya Utara MRT Station site.