August 31, 2018
Pandangan udara kerja-kerja penyiasatan tanah di median Jalan Kuching.

Jalan Kuching

Aerial view of soil investigation works at the median of Jalan Kuching.
August 31, 2018
Pandangan udara pembinaan tiang dan kepala tiang di tapak Stesen MRT Sungai Besi.

Jalan Sungai Besi (Sungai Besi)

Aerial view of pier column and pier head construction at the Sungai Besi MRT Station site.
August 31, 2018
Pandangan udara kerja-kerja tukup cerucuk dan tiang di Kampung Malaysia Raya.

Kampung Malaysia Raya

Aerial view of pile cap and pier works at Kampung Malaysia Raya
August 31, 2018
embinaan kepala tiang di tapak Stesen MRT Putrajaya Sentral.

Putrajaya Sentral

Pier head construction at the Putrajaya Sentral MRT Station site.
August 31, 2018
Pemasangan pelancar gantri di tapak Stesen MRT Cyberjaya City centre.

Persiaran APEC (Cyberjaya City Centre)

Installation of launching gantry at the Cyberjaya City Centre MRT Station site.
August 31, 2018
Pandangan udara pembinaan rasuk portal dan pelancar gantri di tapak Stesen MRT Taman Naga Emas.

Taman Naga Emas

Aerial view of portal beam construction and erection of launching gantry at the Taman Naga Emas MRT Station.
August 31, 2018
Pembinaan kepala tiang di tapak Stesen MRT Cyberjaya North.

Persiaran APEC (Cyberjaya North)

Pier head construction at the Cyberjaya North MRT Station site.
August 31, 2018
Pandangan udara kerja-kerja tiang di tapak Stesen MRT Kuchai Lama.

Jalan Kuchai Lama (Kuchai Lama)

Aerial view of pier construction works at the Kuchai Lama MRT Station site.
August 31, 2018
Pemasangan pelancar gantri di jajaran tapak Stesen MRT 16 Sierra.

Persiaran Sierra Utama (16 Sierra)

Installation of launching gantry at the alignment of the 16 Sierra MRT Station site.