March 31, 2020
Kerja-kerja struktur stesen sedang dijalankan di tapak Stesen MRT Serdang Jaya.

Serdang Jaya

Ongoing station structure works at the Serdang Jaya MRT Station site.
March 31, 2020
Pandangan udara tapak Stesen MRT UPM menunjukkan pemasangan kekuda bumbung dan struktur besi sedang dijalankan.

Jalan UPM (UPM)

Aerial view of the UPM MRT Station site showing the installation of roof truss and steel structure in progress.
March 31, 2020
Pandangan udara Depoh Serdang menunjukkan kerja-kerja saliran di zon F sedang dijalankan.

Serdang Depot

Aerial view of the Serdang Depot showing the drainage works in progress at zone F.
March 31, 2020
Kerja-kerja platform Stesen MRT Taman Equine telah disiapkan.

Taman Equine

Taman Equine MRT Station platform works has been completed.
March 31, 2020
Pandangan udara Stesen MRT 16 Sierra menunjukkan pemasangan kekisi luaran sedang dijalankan.

Putra Permai

Aerial view of the 16 Sierra MRT Station showing the external trellis installation in progress.
March 31, 2020
Pandangan udara pemasangan lapisan pertama lapik bumbung Stesen MRT Cyberjaya Utara sedang dijalankan.

Persiaran APEC (Cyberjaya Utara)

Aerial view of the first layer installation of the Cyberjaya Utara MRT Station roof cover in progress.
March 31, 2020
Pandangan udara pemasangan lapik bumbung di tapak Stesen MRT Cyberjaya City Centre.

Persiaran APEC (Cyberjaya City Centre)

Aerial view of the roof covering installation at the Cyberjaya City Centre MRT Station site.
March 31, 2020
Pandangan udara tapak Stesen MRT Putrajaya Sentral menunjukkan pemasangan besi kekuda bumbung sedang dijalankan.

Putrajaya Sentral

Aerial view of the Putrajaya Sentral MRT Station site showing the ongoing installation of roof steel truss.
February 29, 2020
Pandangan udara kerja-kerja penjubinan sedang dijalankan untuk bilik-bilik aras platform Stesen MRT Sri Damansara Barat.

Jalan Kuala Selangor (Sri Damansara Barat)

Aerial view of the tiling works in progress at the Sri Damansara Barat MRT Station platform level rooms.