Travel with MRT
1800-88-6782
Contact Us
Contact Info
MRT Information Centre
EN
BM
Home
Corporate
MRT Corp
–
Board of Directors
–
Leadership Team
–
Integrity & Governance
–
IMS Policies
Bumiputera Participation
–
Bumiputera Main Work Contractors
Bumiputera Contractors (G1-G7)
MRT Young Entrepreneur Programme (MYEP)
–
Projects
LRT Mutiara Line
–
Circle Line MRT3
–
RTS LINK
–
Benefits of the RTS Link
–
Technical Information
–
Railway Protection Zone
–
MRT Lines
Kajang Line
–
Stations
–
Trains
–
Putrajaya Line
–
Stations
–
Trains
–
Travel With MRT
–
Park N’ Ride
Feeder Bus
–
Business
Tender
–
Tender List
Awarded Contracts
Advertising Space
–
Outdoor Advertising
–
Station Advertising
–
Train Advertising
–
Book Now
Retail Space
–
Event Space
Filming & Photography
–
Kiosk Space
–
Land Leasing
–
News & Events
Media Release
Public Notices
Traffic Announcement
Publications
Events
Projects
Putrajaya Line
Project Updates
Underground
June 30, 2020
Jalan Peel (Escape Shaft 3)
Aerial view of the Escape Shaft 3.
June 30, 2020
Jalan Chan Sow Lin (Chan Sow Lin)
Aerial view of Chan Sow Lin MRT Station site.
June 30, 2020
Jalan Chan Sow Lin (Intervention Shaft 3)
External wall reinforced concrete structure in progress at the Intervention Shaft 3.
June 30, 2020
Sungai Besi Air Force Base (Bandar Malaysia Utara)
Aerial view of the Bandar Malaysia Utara MRT Station showing the ongoing reinforced concrete wall, column, platform slab and waterproofing works.
June 30, 2020
Sungai Besi Air Force Base (Bandar Malaysia Selatan)
Aerial view of the Bandar Malaysia Selatan MRT Station site showing the station box and site laydown.
June 30, 2020
South Portal
Tunnel Boring Machine S-796 breakthrough at South Portal.
May 31, 2020
Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)
Aerial view of Escape Shaft 1 at Jalan Sultan Azlan Shah.
May 31, 2020
Jalan Sultan Azlan Shah (Sentul Barat)
View inside the Sentul Barat MRT Station showing the ongoing construction works of platform reinforced concrete slab.
May 31, 2020
Jalan Tun Razak (Titiwangsa)
Excavation works from lower ground level to the final excavation level at Titiwangsa MRT Station Entrance.
Prev page
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Next page