July 31, 2019
Pandangan Syaf Kecemasan 1 menunjukkan aras bilik loji dengan pembukaan sementara untuk pengambilan semula mesin pengorek terowong.

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

View of Escape Shaft 1 showing the plantroom level with temporary opening for Tunnel Boring Machine retrieval.
July 31, 2019
Pandangan keseluruhan Pintu Masuk C Stesen MRT Sentul Barat.

Jalan Sultan Azlan Shah (Sentul West)

Overall view of Entrance C of the Sentul West MRT Station.
July 31, 2019
Pandangan udara penyediaan kren gantri di tapak Stesen MRT Titiwangsa.

Jalan Tun Razak (Titiwangsa)

Aerial view of the gantry crane setup at the Titiwangsa MRT Station site.
July 31, 2019
Pandangan kerja-kerja pembinaan untuk konkrit bertetulang papak bumbung Pintu Masuk C Stesen MRT Hospital Kuala Lumpur.

Jalan Tun Razak (Hospital Kuala Lumpur)

View of the construction works for reinforced concrete at Hospital Kuala Lumpur MRT Station Entrance C roof slab.
July 31, 2019
Pandangan bahagian terowong yang telah siap dari Persilangan Hospital Kuala Lumpur ke Stesen MRT Ampang Park dengan landasan lokomotif sementara untuk membersihkan tanah di Syaf Penyelenggaraan 1.

Jalan Tun Razak (Intervention Shaft 1)

View of the completed tunnel section from Hospital Kuala Lumpur Crossover to Ampang Park MRT Station with temporary loco track for earth mucking at the Intervention Shaft 1.
July 31, 2019
Pandangan udara tapak Stesen MRT Kampung Baru Utara menunjukkan papak bumbung dan kerja-kerja ruang legar sedang dibina.

Jalan Raja Muda Abdul Aziz (Kampung Baru North)

Aerial view of Kampung Baru North MRT Station site showing the roof slab and concourse works in construction.
July 31, 2019
Rawatan kerja tanah dan campuran tanah lembap dan pengujian sedang dijalankan di tapak Syaf Kecemasan 2

Jalan Gurney (Escape Shaft 2)

Ongoing ground work treatment and wet soil mixing and testing at the Escape Shaft 2 site.
July 31, 2019
Pandangan udara pemasangan penyangga besi antara bilik loji dan aras platform atas Stesen MRT Ampang Park.

Jalan Tun Razak (Ampang Park)

Aerial view of installation of steel struts between plant room and upper platform level of the Ampang Park MRT Station.
July 31, 2019
Pandangan kerja-kerja pemasangan bar pengukuhan papak kekotak stesen, aras ruang legar dan bawah platform di Stesen MRT KLCC Timur.

Jalan Binjai (KLCC East)

View of the station box, concourse level and upper under platform slab reinforcement bar installation works at the KLCC East MRT Station.