October 31, 2019
Pandangan udara Syaf Penyelenggaraan 1 menunjukkan kerja-kerja terowong sedang dijalankan dari Persilangan Hospital Kuala Lumpur ke Stesen MRT Ampang Park.

Jalan Tun Razak (Intervention Shaft 1)

Aerial view of the Intervention Shaft 1 showing the ongoing tunnelling works from Hospital Kuala Lumpur Crossover to Ampang Park MRT Station.
October 31, 2019
Pandangan udara tapak Stesen MRT Kampung Baru Utara menunjukkan penggalian dinding diafragma di Pintu Masuk B yang terletak di hadapan Kondominium Setia Sky. Turut boleh dilihat adalah penggalian dan konkrit tetulang sedang dijalankan di papak ruang legar kekotak stesen.

Jalan Raja Muda Abdul Aziz (Kampung Baru North)

Aerial view of Kampung Baru North MRT Station site showing the excavation of diaphragm wall at Entrance B located in front of Setia Sky Condominium. The excavation and reinforced concrete in progress at concourse slab station box can also be seen
October 31, 2019
Pandangan pembinaan papak asas yang telah siap di tapak Syaf Kecemasan 2.

Jalan Gurney (Escape Shaft 2)

View of the completed base slab construction at the Escape Shaft 2 site.
October 31, 2019
Pandangan kerja-kerja pembinaan papak konkrit tetulang dalam persediaan untuk penerimaan mesin pengorek terowong hala selatan dari Persilangan Hospital Kuala Lumpur ke arah Stesen MRT Ampang Park.

Jalan Tun Razak (Ampang Park)

View of the construction works for reinforced concrete slab in preparation of south bound tunnel boring machine retrieval from Hospital Kuala Lumpur Crossover towards the Ampang Park MRT Station
October 31, 2019
Pandangan tanah kerja-kerja pemasangan rebar sedang dijalankan untuk papak Platform Bawah di tapak Stesen MRT KLCC Timur.

Jalan Binjai (KLCC East)

Ground view of the ongoing rebar installation works of Upper Under Platform slab at the KLCC East MRT Station site.
October 31, 2019
Pandangan Mesin Pengorek Terowong S-775, sedang dalam proses bertukar dari mod Ketumpatan Pembolehubah ke mod Keseimbangan Tekanan Bumi, menggali dari Stesen MRT Conlay ke arah Stesen MRT Ampang Park.

Jalan Conlay (Conlay)

View of the S-775 Tunnel Boring Machine, in the process of converting from Variable Density mode to Earth Pressure Balance mode, mining from Conlay MRT Station towards Ampang Park MRT Station.
October 31, 2019
Persediaan pratuang dinding dalaman menggunakan kerja acuan sistem di tapak Syaf Penyelenggaraan 2.

Kampung Pandan Roundabout (Intervention Shaft 2)

Preparation for internal wall casting using system formwork at the Intervention Shaft 2 site.
October 31, 2019
Pemasangan kerja acuan untuk dinding dalaman di aras terowong hala utara di Syaf Kecemasan 3.

Jalan Peel (Escape Shaft 3)

Formwork installation for internal wall at north bound tunnel level at the Escape Shaft 3.
October 31, 2019
Pembinaan papak asas dan ekzos atas landasan sedang dijalankan di tapak Stesen MRT Chan Sow Lin.

Jalan Chan Sow Lin (Chan Sow Lin)

Construction of base slab and over track exhaust in progress at the Chan Sow Lin MRT Station site.