Kerja-kerja pembinaan konkrit tetulang bawah tanah dan atas tanah di Syaf Penyelenggaraan 3.

Jalan Chan Sow Lin (Intervention Shaft 3)

Construction of both underground and above ground reinforced concrete works at the Intervention Shaft 3.
May 31, 2020
Pandangan Stesen MRT Bandar Malaysia Utara menunjukkan kerja-kerja pemasangan untuk dinding dalaman bawah platform dan akan dihubungkan ke papak platform.

Sungai Besi Air Force Base (Bandar Malaysia Utara)

View of the Bandar Malaysia Utara MRT Station showing the installation works for under platform internal wall which will be connected to the future platform slab.
May 31, 2020
Pandangan udara tapak Portal Selatan menunjukkan kerja-kerja pengukuhan gali dan timbus dan kerja-kerja struktur sedang dijalankan.

South Portal

Aerial view of the South Portal site showing the ongoing cut and cover reinforced concrete structure works.
March 31, 2020
Pandangan udara tapak pembinaan Syaf Penyelenggaraan 1.

Jalan Tun Razak (Intervention Shaft 1)

Aerial view of the Intervention Shaft 1 construction site.
March 31, 2020
Permulaan kerja-kerja pengambilan semula Mesin Pengorek Terowong di Syaf Kecemasan 1.

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

Commencement of Tunnel Boring Machine retrieval works at the Escape Shaft 1
March 31, 2020
Pandangan keseluruhan Pintu C Stesen MRT Sentul Barat

Jalan Sultan Azlan Shah (Sentul Barat)

Overall view of the Sentul Barat MRT Station Entrance C.
March 31, 2020
Pandangan udara tapak pembinaan Stesen MRT Titiwangsa.

Jalan Tun Razak (Titiwangsa)

Aerial view of the Titiwangsa MRT Station construction site.
March 31, 2020
Pandangan udara tapak Stesen MRT Hospital Kuala Lumpur menunjukkan kerja-kerja memasang siap di lengkungan bar untuk kerja-kerja pengukuhan konkrit stesen di papak bilik loji dan papak asas.

Jalan Tun Razak (Hospital Kuala Lumpur)

Aerial view of the Hospital Kuala Lumpur MRT Station site showing the fabrication works at bar bending yard for station reinforcement concrete works at plantroom slab and base slab.
March 31, 2020
Pemasangan bar pengukuhan untuk pembinaan bawah tanah dan pengukuhan papak konkrit di aras ruang legar Stesen MRT Raja Uda

Jalan Raja Muda Abdul Aziz (Raja Uda)

Installation of reinforcement bar for underground construction and reinforcement concrete slab at Raja Uda MRT Station concourse level