July 31, 2019
Kerja-kerja pemecahan batu untuk peringkat akhir penggalian sedang dijalankan di tapak Bandar Malaysia Selatan.

Sungai Besi Air Force Base (Bandar Malaysia South)

Rock hacking works for final excavation level in progress at the Bandar Malaysia South site.
July 31, 2019
Kerja-kerja penggalian sedang dijalankan di Portal Selatan.

South Portal

Ongoing excavation works at the South Portal.
June 30, 2019
Pandangan laluan pejalan kaki dan laluan utiliti di laluan terowong antara terowong Bandar Malaysia Utara dan terowong Chan Sow Lin.

Sungai Besi Air Force Base (Bandar Malaysia North)

View of the walkway and utilities line in the tunnel drive between Bandar Malaysia North tunnel and Chan Sow Lin tunnel.
June 30, 2019
Gambaran keseluruhan papak asas Syaf Kecemasan 1.

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

An overview of the Escape Shaft 1 base slab.
June 30, 2019
Pandangan keseluruhan aras platform Stesen Sentul Barat

Jalan Sultan Azlan Shah (Sentul West)

Overall view of the Sentul West Station Platform Level
June 30, 2019
pemasangan kerja-kerja acuan jadual PERI untuk papak isian bawah tanah sedang dijalankan di Stesen MRT Titiwangsa

Jalan Tun Razak (Titiwangsa)

View of the installation of formwork for lower ground infill slab in progress at the Titiwangsa MRT Station.
June 30, 2019
Pandangan kerja-kerja pemasangan pengukuhan untuk konkrit tetulang papak bumbung Stesen MRT Hospital Kuala Lumpur.

Jalan Tun Razak (Hospital Kuala Lumpur)

View of the installation works of reinforcement for reinforced concrete at roof slab of the Hospital Kuala Lumpur MRT Station.
June 30, 2019
Pandangan kerja-kerja pemasangan konkrit asfalt di tapak Stesen MRT Kampung Baru Utara.

Jalan Raja Muda Abdul Aziz (Kampung Baru North)

Aerial view of the laying works of asphalt concrete at the Kampung Baru North MRT Station site.
June 30, 2019
Kerja-kerja merawat tanah dan campuran tanah lembap sedang dijalankan di tapak Syaf Kecemasan 2.

Jalan Gurney (Escape Shaft 2)

Ongoing ground treatment works and wet soil mixing at the Escape Shaft 2 site.