November 30, 2018
Pandangan udara tapak Syaf Kecemasan 1.

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

Aerial view of the Escape Shaft 1 site.
November 30, 2018
Pandangan udara tapak Stesen MRT Sentul Barat.

Jalan Sultan Azlan Shah (Sentul West)

Aerial view of the Sentul West MRT Station site.
November 30, 2018
Pandangan atas tapak Stesen MRT Titiwangsa.

Jalan Tun Razak (Titiwangsa)

Overhead view of the Titiwangsa MRT Station site.
November 30, 2018
Pembinaan dinding gegendang di tapak Stesen MRT Kampung Baru Utara.

Jalan Raja Muda Abdul Aziz (Kampung Baru North)

Diaphragm wall construction at the Kampung Baru North MRT Station site.
November 30, 2018
Pandangan dari udara tapak Stesen MRT Hospital Kuala Lumpur dengan kerja-kerja pembinaan dinding gegendang dan aktiviti-aktiviti campuran tanah basah.

Jalan Tun Razak (Hospital Kuala Lumpur)

Bird’s-eye view of the Hospital Kuala Lumpur MRT Station site with diaphragm wall construction works and wet soil mixing activities.
November 30, 2018
Kerja-kerja persiapan untuk kerja-kerja konkrit di tapak Syaf Kecemasan 2.

Jalan Gurney (Escape Shaft 2)

Preparation works for concreting works at the Escape Shaft 2 site.
November 30, 2018
Pandangan udara tapak Stesen MRT KLCC Timur.

Jalan Binjai (KLCC East)

Aerial view of the KLCC East MRT Station site.
November 30, 2018
Kerja-kerja penggalian ruang legar atas bagi Stesen MRT Ampang Park.

Jalan Tun Razak (Ampang Park)

Upper concourse excavation works for the Ampang Park MRT Station.
November 30, 2018
Pandangan udara kerja-kerja mengangkat di tapak Syaf Kecemasan 3.

Jalan Peel (Escape Shaft 3)

Aerial view of lifting works at the Escape Shaft 3 site.