Pandangan udara kerja-kerja pengambilan semula Mesin Pengorek Terowong bahagian selatan di Stesen MRT Ampang Park.

Jalan Tun Razak (Ampang Park)

Aerial view of the south bound Tunnel Boring Machine retrieval works at the Ampang Park MRT Station.
July 31, 2020
Pandangan udara tapak Stesen MRT Conlay.

Jalan Conlay (Conlay)

Aerial view of the Conlay MRT Station site.
July 31, 2020
Pandangan udara kerja-kerja pengambilan semula Mesin Pengorek Terowong bahagian selatan di Stesen MRT Ampang Park.

Jalan Tun Razak (Ampang Park)

Aerial view of the south bound Tunnel Boring Machine retrieval works at the Ampang Park MRT Station.
July 31, 2020
Kerja-kerja persediaan untuk tuangan papak aras bawah 1 yang merupakan papak terakhir bawah tanah sebelum mencapai aras atas tanah Syaf Penyelenggaraan 2.

Kampung Pandan Roundabout (Intervention Shaft 2)

Preparation works for basement 1 slab casting which is the last underground slab before reaching Intervention Shaft 2 ground level.
July 31, 2020
Pandangan udara Syaf Kecemasan 3 menunjukkan pembinaan tukup cerucuk.

Jalan Peel (Escape Shaft 3)

Aerial view of the Escape Shaft 3 showing the construction of pile cap
July 31, 2020
Pandangan Syaf Penyelenggaraan 3 menunjukkan tuangan dinding luaran konkrit tetulang.

Jalan Chan Sow Lin (Intervention Shaft 3)

View of the Intervention Shaft 3 showing the casting of reinforced concrete external wall.
July 31, 2020
Pandangan udara Stesen MRT Bandar Malaysia Utara menunjukkan kerja-kerja papak bumbung, dinding konkrit tetulang, tiang dan pengalisan air sedang dijalankan.

Sungai Besi Air Force Base (Bandar Malaysia Utara)

Aerial view of the Bandar Malaysia Utara MRT Station showing the ongoing roof slab, reinforced concrete wall, column and water proofing.
July 31, 2020
Pandangan udara tapak Stesen MRT Bandar Malaysia Selatan menunjukkan kekotak stesen dan susun atur tapak.

Sungai Besi Air Force Base (Bandar Malaysia Selatan)

Aerial view of the Bandar Malaysia Selatan MRT Station site showing the station box and site laydown.
June 30, 2020

Jalan Kepong (Metro Prima)

Backfilling and compaction works in progress for the Multi Storey Park and Ride at the Metro Prima MRT Station site.