June 30, 2020
Pandangan kerja-kerja penggalian, tuangan dinding bawah platform, kerja-kerja pengalir bumi dan tuangan dinding permukaan sedang dijalankan di Stesen MRT Jalan Ipoh.

Jalan Ipoh (Jalan Ipoh)

View of the excavation works, wall below platform casting, earth mat works and skin wall casting works in progress at the Jalan Ipoh MRT Station.
June 30, 2020
Pandangan udara Syaf Kecemasan 1 menunjukkan kren 200t dan 600t bersedia untuk pengambilan semula mesin pengorek terowong.

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

Aerial view of the Escape Shaft 1 showing the 200t and 600t crane on site for Tunnel Boring Machine retrieval.
June 30, 2020
Pemasangan sistem jermang Ekzos Terowong Atas di aras platform Stesen MRT Sentul Barat.

Jalan Sultan Azlan Shah (Sentul Barat)

Overhead Tunnel Exhaust shoring system installation at the Sentul Barat MRT Station platform level.
June 30, 2020
Pandangan udara tapak pembinaan Stesen MRT Titiwangsa.

Jalan Tun Razak (Titiwangsa)

Aerial view of the Titiwangsa MRT Station site.
June 30, 2020
Pembinaan papak tetulang platform dan dinding di tapak Stesen MRT Hospital Kuala Lumpur.

Jalan Tun Razak (Hospital Kuala Lumpur)

Platform reinforced slab and wall construction at the Hospital Kuala Lumpur MRT Station site.
June 30, 2020
Pandangan udara tapak pembinaan Syaf Penyelenggaraan 1.

Jalan Tun Razak (Intervention Shaft 1)

Aerial view of the Intervention Shaft 1 construction site.
June 30, 2020
Pandangan udara Stesen MRT Raja Uda menunjukkan lencongan jalan yang terkini dan kerja-kerja penggalian sedang dijalankan.

Jalan Raja Muda Abdul Aziz (Raja Uda)

Aerial view of the Raja Uda MRT Station showing the current road diversion and excavation works in progress.
June 30, 2020
Pemasangan dinding berkembang pratuang aras 5 bawah Syaf Kecemasan 2.

Jalan Gurney (Escape Shaft 2)

Aerial view of Escape Shaft 2 showing the construction progress of coring and hacking of northbound adit
June 30, 2020
Pemanggasan dinding gegendang untuk memulakan kerja-kerja pembinaan konkrit tetulang dinding di tapak Stesen MRT Ampang Park.

Jalan Tun Razak (Ampang Park)

Hacking of diaphragm wall to begin internal reinforced concrete wall construction at the Ampang Park MRT Station site.