September 30, 2018
Pandangan udara kerja-kerja penggalian di tapak Stesen MRT Bandar Malaysia South.

Sungai Besi Air Force Base (Bandar Malaysia South)

Aerial view of excavation works at the Bandar Malaysia South MRT Station site.
September 30, 2018
Pandangan udara kerja-kerja konkrit bertetulang di tapak Stesen MRT Bandar Malaysia North.

Sungai Besi Air Force Base (Bandar Malaysia North)

Aerial view of reinforced concrete works at the Bandar Malaysia North MRT Station site.
September 30, 2018
Pandangan udara tapak Stesen MRT Chan Sow Lin.

Jalan Chan Sow Lin (Chan Sow Lin)

Aerial view of the Chan Sow Lin MRT Station site.
September 30, 2018
Mengangkat mesin penggali keluar dari kawasan pembinaan syaf di tapak Syaf Kecemasan 3.

Jalan Peel (Escape Shaft 3)

Lifting of an excavator out from the shaft construction area at the Escape Shaft 3 site.
September 30, 2018
Pembersihan letupan batu-bata di tapak Syaf Penyelenggaraan 2.

Kampung Pandan Roundabout (Intervention Shaft 2)

Mucking out the blasted rock at the Intervention Shaft 2 site.
September 30, 2018
Pandangan udara tapak Stesen MRT Conlay menunjukkan kerja-kerja pemasangan topang, penggalian dan pengukuh tanah.

Jalan Conlay (Conlay)

Aerial view of the Conlay MRT Station site showing strutting installation, excavation and ground anchor works.
September 30, 2018
Kerja-kerja perobohan untuk terdahulunya Ampang Park Shopping Centre sedang berlaku bersebelahan dengan tapak Stesen MRT Ampang Park.

Jalan Tun Razak (Ampang Park)

Demolition works of former Ampang Park Shopping Centre taking place next to the Ampang Park MRT Station site.
September 30, 2018
Kerja-kerja tupang untuk takungan hiliran Sungai Bunus di tapak Stesen MRT Kampung Baru North.

Jalan Raja Muda Abdul Aziz (Kampung Baru North)

Strutting works for the Sungai Bunus downstream sump at the Kampung Baru North MRT Station site.
September 30, 2018
Pandangan udara kerja-kerja penggalian di tapak Syaf Penyelenggaraan 1.

Jalan Tun Razak (Intervention Shaft 1)

Aerial view of the excavation works at the Intervention Shaft 1 site.