ProjectsArtikel

Artikel

31 Mei 2022
Berita Harian: Tender projek MRT3 mula dibuka
19 Mei 2022
The Star: RTS on track for completion by 2026
19 Mei 2022
The Edge: RTS Link can be as big as Hong Kong-Shenzhen Western Corridor
19 Mei 2022
Kosmo: RTS bakal kurangkan 35 peratus kesesakan di Tambak Johor
5 Mei 2022
Sinar Harian: Projek MRT3, Projek Keluarga Malaysia
18 Apr 2022
The Star: Need for mindset change on MRT3
4 Apr 2022
The Star: MRT Putrajaya Line holds emergency drill
16 Mac 2022
The Star: ‘MRT3 will cement connectivity’
16 Mac 2022
The Malaysian Reserve: MRT3 to begin construction completes in 2030
16 Mac 2022
The Edge: MOF to raise up to RM50 billion for MRT3; tender to be called in May
16 Mac 2022
Harian Metro: MRT3 dijangka beroperasi 2030
16 Mac 2022
Berita Harian: Lima pakej utama proses tender MRT3
16 Mac 2022
Sinar Harian: MRT3 dijangka beroperasi sepenuhnya 2030
16 Mac 2022
New Straits Times: MRT3 1ST PHASE TO OPEN IN 2028
16 Mac 2022
New Straits Times: MRT3 CIRCLE LINE TO COST RM39.4 BILLION
16 Mac 2022
Utusan Malaysia: Kos MRT3 RM31 bilion
7 Mac 2022
New Straits Times: ‘MRT3 BOOSTS PUBLIC TRANSPORT COVERAGE IN KLANG VALLEY’
5 Mac 2022
New Straits Times: MRT3 LINE GETS GOVT NOD
5 Mac 2022
Harian Metro: PERSETUJUAN KABINET
5 Mac 2022
Sinar Harian: Kerajaan setuju laksana MRT3