No. | Nama Pakej | Tarikh Surat Pemberian Kontrak | Kontraktor |
---|---|---|---|
1 | AW1 - Package A Dilapidation Survey Works for Semantan and Cochrane launching shaft | 2 March 2011 | Cunningham Lindsey Adjusters (M) Sdn Bhd |
2 | AW2 - Package C1 Construction and completion of working platform including Earthworks, Access Road, Drainage Works,TNB Substation, Retaining Walls, Utilities Protection and Ancillary Works for Semantan launching shaft | 3 June 2011 | Menta Construction Sdn Bhd |
3 | AW3 - Package C2 Construction and completion of working platform including demolition of existing government quarters and playground, site clearance, utilities protection, drainage works, TNB substation, tree relocation, traffic diversion & control and ancillary works for Cochrane launching shaft | 3 June 2011 | Ragawang Corporation Sdn Bhd |
4 | AW4 - Package D1 Relocation of existing telecommunication & power supply cables for Cochrane launching shaft | 27 May 2011 | E.S.S. Engineering Sdn Bhd LOA by PDP |
5 | AW5 - Package D2 Relocation of existing sewerage and water mains for Cochrane launching shaft | 24 June 2011 | Puncak Niaga (M) Sdn Bhd |
6 | AW6 - Package E Supply and installation of instrumentation and equipment for monitoring works including automated total station for Semantan and Cochrane launching shaft | 9 June 2011 | Soil Instruments (M) Sdn Bhd |
7 | AW7- Package F1 Construction and completion of contiguous bored piles including ground anchor for Semantan launching Shaft | 6 March 2012 | Geohan Sdn Bhd |
8 | AW8 - Package F2 Construction and completion of secant bored pile for Cochrane launching shaft | 15 August 2011 | Bauer (M) Sdn Bhd |
9 | AW9 Construction and completion of earthworks and associated works (Phase 1) at Sungai Buloh Depot | 9 June 2011 | Gadang Engineering (M) Sdn Bhd |
10 | AW10 Demolition of chiller room, pump houses and removal of piles obstructing TMB drive at IPPKKL | 17 October 2011 | Pembinaan CW Yap Sdn Bhd |
11 | AW11 - Package GPL1 Relocation of existing gas pipe line for KL Sentral | 6 March 2012 | Misi Setia Oil and Gas Sdn Bhd |
12 | AW12 - Package SYB1 Relocation of existing water pipe line and traffic management for utilities relocation for KL Sentral | 31 January 2012 | Hatimuda Sdn Bhd |
13 | AW13 - Package TEL1 The relocation of existing telecommunication lines for KL Sentral | 14 December 2011 | Sri Communication Sdn Bhd |
14 | AW14 - Package TCO1 The relocation of existing fibre optic lines for KL Sentral | 14 December 2011 | Tenaga Nirwana (M) Sdn Bhd |
15 | AW15 - Package TNB1 The relocation of existing power supply cables for KL Sentral and Merdeka | 14 December 2011 | Worktime Engineering Sdn Bhd |
16 | AW16 - Package TEL2 The relocation of existing telecommunication lines for Merdeka | 14 December 2011 | Sri Communication Sdn Bhd |
17 | AW17 - Package SYB2 Relocation of existing water pipe line for Maluri | 8 March 2012 | MMC Gamuda KVMRT (PDP) Sdn Bhd |
18 | AW18 - Package TEL3 Relocation of existing telecommunication lines for Maluri | 19 January 2012 | Sri Communication Sdn Bhd |
19 | AW19 - Package TCO2 Relocation of existing fibre optic lines for Maluri | 19 January 2012 | Fastpro Sdn Bhd |
20 | AW20 - Package TNB2 Relocation of existing power supply cables for Maluri | 6 March 2012 | Huls Transmission Sdn Bhd |
21 | AW21 Grouting works, underground excavation, ground anchors and rock bolts for Cochrane launching shaft & station | 8 March 2012 | Keller (M) Sdn Bhd |
22 | AW22 Demolition of superstructure for Klang bus stand, Plaza Warisan and UO superstore, supply and installation of 1MVA compact substation and all necessary associated works for Pasar Seni Station | 6 March 2012 | Pembinaan C W Yap Sdn Bhd |
PART B : GUIDEWAY (VIADUCT) | |||
23 | Elevated Section V1 - Viaduct Construction and completion of viaduct guideway and other associated works from Sungai Buloh to Kota Damansara Station | 18 May 2012 | Syarikat Muhibah & Perniagaan & Pembinaan Sdn Bhd |
24 | Elevated Section V2 - Viaduct Construction and completion of viaduct guideway and other associated works from Kota Damansara to Dataran Sunway Station | 10 July 2012 | Gadang Engineering (M) Sdn Bhd |
25 | Elevated Section V3 - Viaduct Construction and completion of viaduct guideway and other associated works from Dataran Sunway to Section 17 | 10 July 2012 | Mudajaya Corporation Berhad |
26 | Elevated Section V4 - Viaduct Construction and completion of viaduct guideway and other associated works from Section 17 to Semantan Portal | 18 May 2012 | Sunway Construction Sdn Bhd |
27 | Elevated Section V5 - Viaduct Construction and completion of viaduct guideway and other associated works from Maluri portal to Plaza Phoenix station | 16 February 2012 | IJM Construction Sdn Bhd |
28 | Elevated Section V6 - Viaduct Construction and completion of viaduct guideway and other associated works from Plaza Phoenix station to Bandar Tun Hussein Onn Station | 16 February 2012 | Ahmad Zaki Sdn Bhd |
29 | Elevated Section V7 - Viaduct Construction and completion of viaduct guideway and other associated works from Bandar Tun Hussein Onn to Taman Mesra | 18 May 2012 | MTD Construction Sdn Bhd |
30 | Elevated Section V8 - Viaduct Construction and completion of viaduct guideway and other associated works from Taman Mesra to Kajang Station | 26 September 2012 | UEM Construction Sdn Bhd |
PART C : DEPOTS | |||
31 | Package Dpt1: Construction And Completion Of Sungai Buloh Maintenance Depot, Administration Building, External Works And Other Associated Works | 18 May 2012 | Trans Resources Corporation Sdn Bhd |
32 | Package Dpt2: Construction And Completion Of Kajang Maintenance Depot, External Works And Other Associated Works | 24 July 2012 | TSR Bina Sdn Bhd |
PART D : UNDERGROUND WORKS | |||
33 | Underground works (Tunnel stations & associated structures) between Semantan north portal and Maluri south portal | 30 March 2012 | MMC Gamuda KVMRT (T) Sdn Bhd |
PART E : MULTISTOREY CAR PARKS | |||
34 | Package MSPR1 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Sungai Buloh Station | 24 July 2012 | TSR Bina Sdn Bhd |
35 | Package MSPR9 : Construction and Completion of Multi Storey Car Oark Building, External Works And Other Associated Works At Kajang Station | 3 August 2013 | SMPP-IBWANI Joint Venture |
36 | Package MSPR6 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Taman Bukit Mewah Station | 30 June 2014 | Perkasa Sutera Sdn Bhd |
37 | Package MSPR11 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Saujana Impian Station | 30 June 2014 | RD Resources Sdn Bhd |
38 | Package MSPR8 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Taman Koperasi Station | 30 June 2014 | Innoseven Sdn Bhd |
39 | Package MSPR4 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Section 16 Station | 30 June 2014 | Budaya Restu Sdn Bhd |
PART F : SYSTEMS | |||
System Group 1 | |||
40 | Systems Work Package SBK-S-01 : Engineering, Procurement, Construction, Testing & Commissioning Of Electric Trains | 28 September 2012 | Consortium of Siemens Malaysia Sdn Bhd, Siemens AG and SMH Rail Sdn Bhd |
41 | Systems Work Package SBK-S-02 : Engineering, Procurement, Construction, Testing & Commissioning Of Depot Equipment & Maintenance Vehicles | 28 September 2012 | Consortium of Siemens Malaysia Sdn Bhd, Siemens AG, Hisniaga Sdn Bhd |
42 | Systems Work Package SBK-S-03 : Engineering, Procurement, Construction, Testing & Commissioning Of Signalling & Train Control System | 28 September 2012 | Bombardier (Malaysia) Sdn Bhd |
43 | System Works Package SBK-S-04 : Engineering, Procurement, Construction, Testing & Commissioning Of Platform Screen Doors and Automatic Platform Gates | 31 January 2013 | Singapore Technologies Electronics Limited |
System Group 2 | |||
44 | Systems Work Package SBK-S-05 : Engineering, Procurement, Construction, Testing & Commissioning Of Power Supply & Distribution System | 28 September 2012 | Meidensha Corporation |
45 | Systems Work Package SBK-S-06 : Engineering, Procurement, Construction, Testing & Commissioning Of Track Works | 31 October 2012 | Mitsubishi Heavy Industries, Ltd |
System Group 3 | |||
46 | Systems Works Package -SBK-S-07: Engineering, Procurement, Construction, Testing & Commissioning Of Telecommunication System | 31 October 2012 | Apex Communication Sdn Bhd - LG CNS Consortium |
47 | System Works Package SBK-S-08 : Engineering, Procurement, Construction, Testing & Commissioning Of Facility Scada | 8 November 2012 | A.F.S. Engineering (M) Sdn Bhd - ST Electronics Ltd |
48 | System Works Package SBK-S-09 : Engineering, Procurement, Construction, Testing & Commissioning Of Automatic Fare Collection System | 22 November 2012 | Affiliated Computer Services Solutions France SAS |
49 | System Works Package SBK-S-10 : Engineering, Procurement, Construction, Testing & Commissioning Of Electronic Access Control System | 8 November 2012 | Apex Communication Sdn Bhd - Johnson Controls (M) Sdn Bhd |
50 | System Works SBK-S-11 : Engineering, Procurement, Construction, Testing & Commissioning Of Building Management System | 8 November 2012 | Metronic Engineering Sdn Bhd |
51 | System Works Package SBK-S-12 : Engineering, Procurement, Construction, Testing & Commissioning Of Government Integrated Radio Network | 4 June 2013 | Sapura Research Sdn Bhd |
52 | Works Package SBK-S-13 : Design, Procurement, Configuration, Installation, Testing & Commissioning Of IT System For All Elevated And Underground Section Stations and Depots | 23 July 2014 | EV- Dynamic Sdn Bhd |
PART G: ELEVATED STATIONS | |||
53 | Package S1 : Construction And Completion Of Elevated Stations And Other Associated Works At Sungai Buloh, Kg. Baru Sungai Buloh And Kota Damansara | 28 August 2012 | Trans Resources Corporation Sdn Bhd |
54 | Package S2 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Industrial Sungai Buloh, PJU 5 And Dataran Sunway | 3 October 2012 | Naim Engineering Sdn Bhd |
55 | Package S3 : Construction And Completion Of Elevated Stations And Other Associated Works At The Curve, One Utama And Tamn Tun Dr Ismail | 3 October 2012 | UEM Construction Sdn Bhd |
56 | Package S4 : Construction And Completion Of Elevated Stations And Other Associated Works At Section 16, Bandar Damansara And Semantan | 7 September 2012 | Naim Engineering Sdn Bhd |
57 | Package S5 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Bukit Ria, Taman Bukit Mewah, Leisure Mall And Plaza Phoenix | 24 July 2012 | IJM Construction Sdn Bhd |
58 | Package S6 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Suntex, Taman Cuepacs And Bandar Tun Hussein Onn | 28 August 2012 | Ahmad Zaki Sdn Bhd |
59 | Package S7 : Construction And Completion Of Elevated Stations And Other Associated Works At Balakong And Taman Koperasi | 28 August 2012 | Apex Communication Sdn Bhd |
60 | Package S8 : Construction And Completion Of Elevated Stations And Other Associated Works At Saujana Impian, Bandar Kajang And Kajang | 3 October 2012 | Apex Communication Sdn Bhd |
PART H: CIVIL & STRUCTURAL AND OTHER WORKS | |||
61 | SBG-Northern Supply And Delivery Of Segmental Box Girders (Sbg) For Proposed Projek Mass Rapid Transit Lembah Kelang: Jajaran Sg Buloh – Kajang (Northern Section) | 2 February 2012 | SPC Industries Sdn Bhd |
62 | SBG-Southern Supply And Delivery of Segmental Box Girders (Sbg) For Proposed Projek Mass Rapid Transit Lembah Kelang: Jajaran Sungai Buloh-Kajang 9 (Southern Section) | 2 February 2012 | Eastern Pretech (M) Sdn Bhd |
63 | Package V1 to V8 : Design, Supply, Installation, Testing And Commissioning Of Noise Barriers And Enclosures | 18 March 2013 | Muhibbah - SV 0 Samjung JV |
64 | Package ECS1 : Supply, Procurement, Installation, Testing And Commissioning Of Environmental Control System For Elevated Package V1 To V4 And Sungai Buloh Depot | 18 March 2013 | Kejuruteraan Astra Sdn Bhd |
65 | Package ECS2 : Supply, Procurement, Installation, Testing And Commissioning Of Environmental Control System For Elevated Package V5 To V8 And Kajang Depot | 18 March 2013 | FastColl Corporation Sdn Bhd |
66 | Package FD1 : Supply, Procurement, Installation, Testing and Commissioning of Fire Detection and Protection System for Elevated Package V1 to V2 and Sungai Buloh Depot | 6 April 2013 | P. J. Indah Sdn Bhd |
67 | Package FD2 : Supply, Procurement, Installation, Testing and Commissioning of Fire Detection and Protection System for Elevated Package V3 to V4 | 16 August 2013 | Fitters-MPS Sdn Bhd |
68 | Package FD3 : Supply, Procurement, Installation, Testing And Commissioning Of Fire Detection and Protection System For Elevated Package V5 To V5 | 18 March 2013 | Zulfan (M) Sdn Bhd |
69 | Package FD4 : Supply, Procurement, Installation, Testing And Commissioning Of Fire Detection And Protection System For Elevated Package V7 To V8 And Kajang Depot | 13 June 2013 | Mecomb Malaysia Sdn Bhd |
70 | Package SDDT-E : Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of Step Down Distribution Transformer For All Elevated Packages, Sungai Buloh and Kajang Depot | 18 March 2013 | PTIS Engineering Sdn Bhd |
71 | Package UPS-E : Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of Uninterruptible Power Supply For All Elevated Stations | 18 March 2013 | Info-Matic Power Sdn Bhd |
72 | Package LS-E : Supply, Installation, Testing And Commissioning Of Lift System For All Elevated Packages, Sungai Buloh Depot And Multi Storey Carparks | 18 March 2013 | Otis Elevator Company (M) Sdn Bhd |
73 | Package ETS-E : Supply, Procurement, Installation, Testing And Commissioning Of Escalator And Travelator System For All Elevated Stations | 31 January 2013 | MS Elevators Engineering Sdn Bhd |
74 | Package LED-E : Design, Supply, Procurement, Installation, Testing And Commissioning Of LED Lighting and Lighting Boom Equipment For All Elevated Packages | 20 December 2013 | Norangkasa Enterprise Sdn Bhd |
75 | Package SDDT-U : Supply, Delivery and Supervision of Step Down Distribution Transformer for All Underground Stations and Ancillary Buildings | 25 July 2014 | PTIS Engineering Sdn Bhd |
76 | Package LS-U : Supply, Procurement, Installation, Testing and Commissioning of Lift System For All Underground Stations and Ancillary Building | 25 July 2014 | EITA Elevator (Malaysia) Sdn Bhd |
77 | Package UPS-U : Supply, Delivery and Supervision of Installation, Testing And Commissioning Of Uninterruptible Power Supply For All Underground Stations and Ancillary Buildings | 13 November 2014 | Info-Matic Power Sdn Bhd |
78 | Package ETS-U : Supply, Procurement, Installation, Testing And Commissioning Of Escalator And Travelator System For All Underground Stations | 25 November 2014 | Eita Elevator (Malaysia) Sdn Bhd |
79 | Package LED-U1 : Supply, delivery and supervision of installation, testing and commissioning of LED lighting for underground station from KL Sentral to Bukit Bintang | 1 April 2015 | Sena Letrik (M) Sdn Bhd / LED Vision Sdn Bhd JV |
80 | Package LED-U2 : Supply, delivery and supervision of installation, testing and commissioning of LED lighting for underground station from Pasar Rakyat to Maluri | 1 April 2015 | Sena Letrik (M) Sdn Bhd / LED Vision Sdn Bhd JV |
81 | Package PASS: Construction and Completion of Pasar Seni Paid Link and Other Associated Works Between Existing Pasar Seni LRT Station and Kuala Lumpur KTM Station. | 24 March 2016 | Trans Resources Corporation Sdn Bhd |
82 | Package OFF : Supply, Delivery and Installation of Office Furniture for All Elevated and Underground Stations, Depots and Multi Storey Car Parks. | 3 May 2016 | Puncak Bumi Utama Sdn Bhd |
83 | Package SIGN-U : Supply and Delivery of Signages for All Underground Stations and Ancillary Buildings. | 5 May 2016 | S&I Urban Designers Sdn Bhd |
84 | Package Sign E1 : Supply, Procurement, Installation, Testing And Commissioning Of Wayfinding And Operation & Maintenance Signage For Viaduct Section And Elevated Stations At Package V1, V2, V3 And V4. | 3 May 2016 | KI Engineering Sdn Bhd |
85 | Package Sign E2 : Supply, Procurement, Installation, Testing And Commissioning Of Wayfinding And Operation & Maintenance Signage For Viaduct Section And Elevated Stations At Package V5, V6, V7 And V8. | 3 May 2016 | Kemakmuran 2000 Sdn Bhd |
PART I : FEEDER BUS | |||
86 | Cadangan Membina Sebuah Depoh Bas dan Kemudahan Sokongan Berkaitan Bagi Projek Mass Rapid Transit Lembah Klang, Jajaran Sungai Buloh - Kajang Di atas Lot 81520 Seluas 10.55 ekar, Seksyen U4, 40150 Shah Alam, Selangor Darul Ehsan. | 7 October 2015 | Perkasa Jauhari Sdn Bhd |
87 | Manufacture, Supply, Delivery, Testing, Commissioning and Warranty of One Hundred Fifty (150) Units of Single Deck 10 Metre Completely-Knocked-Down (CKD) Diesel City Feeder Buses for Mass Rapid Transit Corporation Sdn Bhd. | 8 October 2015 | Scania Malaysia Sdn Bhd |
88 | Manufacture, Supply, Delivery, Testing, Commissioning and Warranty of One Hundred Fifty (150) Units of Single Deck 10 Metre Completely-Knocked-Down (CKD) Diesel City Feeder Buses for Mass Rapid Transit Corporation Sdn Bhd. | 8 October 2015 | Volvo Malaysia Sdn Bhd |
89 | Design, Manufacture, Deliver, Integrate, Test, Commission and Warranty of MRT Feeder Bus System. | 24 November 2015 | LG CNS Malaysia Sdn Bhd |
90 | Proposed MRT Feeder Bus Depot and Related Supporting Buildings and Facilities for Klang Valley Mass Rapid Transit Project, Sungai Buloh - Kajang Line, at Lot 24728, Jalan Sungai Sekamat, 43000 Mukim Kajang, Daerah Hulu Langat, Selangor Darul Ehsan For Mass Rapid Transit Corporation Sdn Bhd (MRT CORP). | 25 March 2016 | Potensi Cekal Sdn Bhd |
91 | Proposed MRT Feeder Bus Depot and Related Supporting Buildings and Facilities for Klang Valley Mass Rapid Transit Project, Sungai Buloh - Kajang Line, at Lot 2816 (PA 14383), Persiaran 2/118C, Kawasan Perindustrian Desa Tun Razak, Mukim Petaling, Daerah Petaling, 56000 Wilayah Persekutuan Kuala Lumpur For Mass Rapid Transit Corporation Sdn Bhd (MRT CORP). | 4 May 2016 | Pasdec Bina Sdn Bhd |
Senarai Kontrak Yang Dianugerahkan
No | Nama Kontrak Pakej Kerja | Tarikh Surat Pemberian Kontrak | Kontraktor |
---|---|---|---|
KERJA-KERJA AWALAN | |||
1 | Advance Works Package 1: Design & Build Of Installation, Testing And Commissioning Of TNB Pylon And Overhead Transmission Line Relocation. | 23 November 2015 | P.E.S.B. Engineering Sdn Bhd |
2 | Advance Works Package 2: Design & Build Of Installation, Testing And Commissioning Of TNB Pylon And Overhead Transmission Line Relocation. | 23 November 2015 | Huls Transmission Sdn Bhd |
3 | Design & Build of New JKR Wilayah Persekutuan Workshop Including Automotive and Heavy Machinery Workshop & Associated Buildings at Lot 1571, Jalan 6/19 Cheras Together With Taska, Tennis Court & Access Road Development at Existing JKR Wilayah Persekutuan Chan Sow Lin Vicinity. | 02 February 2016 | Acre Works Sdn Bhd |
4 | Demolition Works At Block C, Bangunan Sultan Abdul Samad. | 02 February 2016 | Central Geo Sdn Bhd |
5 | Renovation And Conservation Works To Block A & Block C, Bangunan Sultan Abdul Samad (BSAS), Including:- i) Relocation Of Craft Museum, Karyaneka Office, Craft Management Office And JWN Office To Block C, Bangunan Sultan Abdul Samad ii) Relocation Of Karyaneka Craft Boutique And Souvenir Shops To Block A, Bangunan Sultan Abdul Samad iii) Relocation Of Craft Village And Artist Village To Dataran Underground. | 25 March 2016 | Trans Resources Corporation Sdn Bhd |
6 | Design & Build Of New Double Storey Structure For Cafeteria And Preka Centre At Craft Complex Kuala Lumpur, Jalan Conlay. | 14 March 2016 | M.O. Jaya Sdn Bhd |
7 | Design & Build of 20 Storey Police Quarters Consists of 300 Units of Police Quarters Class F with Facilities and 5 Storey Podium Carpark. | 29 March 2016 | WCT Berhad |
8 | Design & Build of 17-Storey Police Quarters Consisting of 136 Units Class F Quarters Complete With Facilities and 6- Storey Carpark Podium On Lot 46 And Lot 47, Jalan Suasa 2, Mukim Petaling, Pekan Sungai Besi Police Quarters | 15 July 2016 | SN AKMIDA Holdings Sdn Bhd |
KERJA BAWAH TANAH | |||
1 | Construction And Completion Of Tunnels, Stations And Associated Structures from Jalan Ipoh North Escape Shaft to Desa Waterpark South Portal. | 31 March 2016 | MMC Gamuda KVMRT (T) Sdn Bhd |
JEJAMBAT | |||
1 | Package V201 : Construction and Completion of Viaduct Guideway and Other Associated Works From Sungai Buloh to Persiaran Dagang. | 31 March 2016 | Sunway Construction Sdn Bhd |
2 | Package V202 : Construction and Completion of Viaduct Guideway and Other Associated Works from Persiaran Dagang to Jinjang. | 04 April 2016 | Ahmad Zaki Sdn Bhd |
3 | Package V203 : Construction and Completion of Viaduct Guideway and Other Associated Works From Jinjang to Jalan Ipoh North Portal. | 19 May 2016 | IJM Construction Sdn Bhd |
4 | Package V204: Construction and Completion of Viaduct Guideway and Other Associated Works from Bandar Malaysia South Portal to Kampung Muhibbah. | 14 November 2016 | WCT Berhad |
5 | Package V205: Construction and Completion of Viaduct Guideway and Other Associated Works from Kampung Muhibbah to Serdang Raya. | 10 March 2017 | Trans Resources Corporation Sdn Bhd |
6 | Package V206: Construction and Completion of Viaduct Guideway and Other Associated Works from Serdang Raya to UPM. | 10 March 2017 | Gadang Engineering (M) Sdn Bhd |
7 | Package V207: Construction and Completion of Viaduct Guideway and Other Associated Works from UPM to Taman Pinggiran Putra. | 15 December 2016 | Mudajaya Corporation Berhad |
8 | Package V208: Construction and Completion of Viaduct Guideway and Other Associated Works from Taman Pinggiran Putra to Persiaran Alpina. | 17 November 2016 | MTD Construction Sdn Bhd |
9 | Package V209: Construction and Completion of Viaduct Guideway and Other Associated Works from Persiaran Alpinia to Persiaran Apec. | 10 March 2017 | Acre Works Sdn Bhd |
10 | Package V210 : Construction and Completion of Viaduct Guideway and Other Associated Works From Persiaran APEC to Putrajaya Sentral. | 19 May 2016 | Malaysian Resources Corporation Berhad |
SISTEM | |||
1 | Package SY201 : Engineering, Procurement, Construction, Testing & Commissioning Of Signalling & Train Control System And Platform Screen Doors/ Automatic Platform Gates. | 19 May 2016 | Bombardier - Global Rail Consortium (Bombardier Malaysia Sdn Bhd - Global Rail Sdn Bhd Consortium) |
2 | Package SY202 : Engineering, Procurement, Construction, Testing & Commissioning Of Integrated Control Supervisory System And Computerised Maintenance Management System. | 05 May 2016 | Najcom - EVD Joint Venture (Najcom Sdn Bhd - EV Dynamics Sdn Bhd Joint Venture) |
3 | Package SY203 : Engineering, Procurement, Construction, Testing & Commissioning Of Electric Trains And Depot Equipment. | 19 May 2016 | HAP Consortium (Hyundai Rotem Company - Apex Communications Sdn Bhd - Posco Engineering Co. Ltd Consortium) |
4 | Package SY204 : Engineering, Procurement, Construction, Testing & Commissioning Of Trackworks, Maintenance Vehicles & Works Train. | 25 August 2016 | CCCC - George Kent JV (China Communication Construction Company Ltd - George Kent Malaysia Berhad JV) |
5 | Package SY205 : Engineering, Procurement, Construction, Testing & Commissioning Of Power Supply And Distribution System. | 14 July 2016 | Colas Rail Consortium (Colas Rail SA - Colas Rail System Engineering Sdn Bhd Consortium) |
6 | Package SY206 : Engineering, Procurement, Construction, Testing & Commissioning Of Communications, Government Integrated Radio Network, Commercial Telecom (INFRA) And Information Technology System. | 01 August 2016 | Sapura - EVD Consortium (Sapura Holdings Sdn Bhd - EV Dynamic Sdn Bhd Consortium) |
7 | Package SY207: Engineering, Procurement, Construction, Testing & Commissioning of Automatic Fare Collection System. | 14 September 2016 | Indra Sistemas and Rasma Corporation Consortium (Indra Sistemas SA - Rasma Corporation Sdn Bhd Consortium) |
STESEN | |||
1 | Package S201: Construction and Completion of Elevated Stations and Other Associated Works at Damansara Damai, Sri Damansara West and Sri Damansara East. | 10 March 2017 | Sunway Construction Sdn Bhd |
2 | Package S202: Construction and Completion of Elevated Stations and Other Associated Works at Kepong Sentral, Metro Prima, Kepong Baru and Jinjang. | 21 December 2016 | S.N. Akmida Holdings Sdn Bhd |
3 | Package S203: Construction and Completion of Elevated Stations and Other Associated Works at Sri Delima, Kampung Batu and Kentonmen and Half Sunken Station Jalan Ipoh. | 14 June 2017 | IJM Construction Sdn Bhd |
4 | Package S204: Construction and Completion of Elevated Stations and Other Associated Works at Kuchai Lama and Taman Naga Emas. | 19 September 2017 | WCT Berhad |
5 | Package S205: Construction and Completion of Elevated Stations and Other Associated Works at Sungai Besi and Serdang Raya (North). | 12 October 2017 | Apex Communications Sdn Bhd |
6 | Package S206: Construction and Completion of Elevated Stations and Other Associated Works at Serdang Raya (South), Seri Kembangan and UPM. | 12 October 2017 | Ahmad Zaki Sdn Bhd |
7 | Package S208: Construction and Completion of Elevated Stations and Other Associated Works at Equine Park and Taman Putra Permai. | 19 September 2017 | S.N. Akmida Holdings Sdn Bhd |
8 | Package S209: Construction and Completion of Elevated Stations and Other Associated Works at 16 Sierra and Cyberjaya North. | 12 October 2017 | Acre Works Sdn Bhd |
9 | Package S210: Construction and Completion of Elevated Stations and Other Associated Works at Cyberjaya City Centre and Putrajaya Sentral. | 15 September 2017 | Malaysian Resources Corporation Berhad |
PEMBEKAL KHUSUS | |||
1 | Package SBG201 : Supply and Delivery of Segmental Box Girders (SBG) (Packages V201 to V205). | 25 March 2016 | SPC Industries Sdn Bhd |
2 | Package SBG202 : Supply and Delivery of Segmental Box Girders (SBG) (Packages V206 to V210). | 25 March 2016 | Acre Works Sdn Bhd |
3 | Package UPS201 : Design, Supply, Delivery, Supervision Of Installation, Testing And Commissioning Of Uninterruptible Power Supply For Elevated Stations. (Package: V201, V202 & Part V203) | 09 January 2019 | Itmax System Sdn Bhd |
4 | Package UPS202 : Design, Supply, Delivery, Supervision Of Installation, Testing And Commissioning Of Uninterruptible Power Supply For Elevated Stations And Depot (Package: Part V203, V204 To V210 And DPT201) | 31 December 2018 | CSPM Resources Sdn Bhd - CSPM Sdn Bhd Consortium |
KONTRAKTOR KHUSUS | |||
1 | Package L&E201 : Supply, Procurement, Installation, Testing and Commissioning of Lift and Escalator System for Elevated Stations (Package: V201, V202 & Part V203) | 19 September 2017 | Rani - MS Engineering Sdn Bhd |
2A | Package L&E202: Supply, Procurement, Installation, Testing and Commissioning of Lift and Escalator System for Elevated Stations.(Package: Part V203 ,V204, V205 And V206). | 12 October 2017 | EITA Elevator (M) Sdn Bhd |
2B | Package L&E202: Supply, Procurement, Installation, Testing and Commissioning of Lift and Escalator System for Elevated Stations.(Package: V208, V209, V210 And DPT201). | 12 October 2017 | Rani - MS Engineering Sdn Bhd |
3 | Package BMS201: Design, Supply, Installation, Testing and Commissioning of Building Management System For Elevated (V201 to V210) and Depot (DPT201). | 12 October 2017 | Global Rail Dom Industries (BMS 201) Joint Venture (Global Rail Sdn Bhd - Dom Industries (M) Sdn Bhd Joint Venture) |
4 | Package NB201: Design, Supply, Installation, Testing and Commissioning of Noise Barriers and Enclosures for Section I (V201 to V203) and Section II (V204 to V210) | 15 December 2017 | Muhibbah Engineering (M) Bhd |
5 | Package EAC201: Design, Supply, Installation, Testing & Commissioning Of Electronic Access Control System | 15 December 2017 | Apex Johnson Controls Consortium |
6 | Package LED201: Design, Supply, Procurement, Installation, Testing and Commissioning of LED Lighting for Elevated Stations (Packages V201 to V203) | 15 December 2017 | Norangkasa Enterprise Sdn Bhd |
7 | Package LED202: Design, Supply, Procurement, Installation, Testing and Commissioning of LED Lighting for Elevated Stations (Packages V204 to V206) | 28 March 2018 | Itmax System Sdn Bhd |
8 | Package LED203: Design, Supply, Procurement, Installation, Testing and Commissioning of LED Lighting for Elevated Stations (Packages V208 to V210) | 31 December 2018 | S.A. Continental JV Hexachamp Sdn Bhd (S.A. Continental Sdn Bhd - Hexachamp Sdn Bhd) |
9 | Package BMS202: Design, Supply, Installation, Testing and Commissioning of Building Management System for Underground Works. | 27 March 2018 | Metronic Engineering Sdn Bhd |
DEPOH | |||
1 | Package DPT201 : Construction and Completion of Serdang Maintenance Depot, External Works and Other Associated Works. | 12 September 2017 | Consortium KKM - TRC (Konsortium Kontraktor Melayu Sdn Bhd - Trans Resources Corporation Sdn Bhd) |
2 | Package DPT203 : Construction and Completion of Earthworks And Other Associated Works For Serdang Depot. | 05 May 2016 | TSR Bina Sdn Bhd |
BAS PERANTARA | |||
1 | Package BDT 201: Proposed Construction and Completion of SSP Line Feeder Bus Depot and Associated Works at Jinjang, Kuala Lumpur for Mass Rapid Transit Corporation Sdn Bhd (MRT CORP). | 17 May 2019 | Pembinaan Ikhasas - Merak Sdn Bhd |