November 25, 2022
Jambatan pejalan kaki di Stesen MRT 16 Sierra.

Persiaran Sierra Utama (16 Sierra)

Pedestrian Overhead Bridge (POB) at 16 Sierra Station.
November 25, 2022
Kerja-kerja penambahbaikan di Stesen MRT Cyberjaya Utara.

Persiaran APEC (Cyberjaya Utara)

Enhancement works at the Cyberjaya Utara MRT Station.
November 25, 2022
Kerja-kerja pengujian tren sedang dijalankan di Stesen MRT Cyberjaya City Centre

Persiaran APEC (Cyberjaya City Centre)

Testing train works are in progress at the Cyberjaya City Centre MRT Station
November 25, 2022
Pengujian dan pentauliahan sistem pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Putrajaya Sentral.

Putrajaya Sentral

Testing and commissioning of Automatic Fare Collection (AFC) gate system are in progress at the Putrajaya Sentral MRT Station.
October 30, 2022
Laluan berbumbung dan kawasan menurun dan mengambil penumpang untuk bas dan teksi telah siap di Stesen MRT Kentonmen.

Jalan Ipoh (Kentonmen)

Covered walkway and drop off/pick up passengers area for bus and taxi are completed at the Kentonmen MRT Station
October 30, 2022
Pengujian dan pentauliahan sistem pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Jalan Ipoh.

Jalan Ipoh (Jalan Ipoh)

Testing and commissioning of Automatic Fare Collection gate system in progress at the Jalan Ipoh MRT Station.
October 30, 2022
Pandangan keseluruhan aras dek bumbung bawah Syaf Kecemasan 1.

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

Overall view of Escape Shaft 1 lower roof deck level.
October 30, 2022
Pandangan keseluruhan aras platform Stesen MRT Sentul Barat

Jalan Sultan Azlan Shah (Sentul Barat)

Overall view of the Sentul Barat MRT Station platform level.
October 30, 2022
Pandangan udara Stesen MRT Titiwangsa dengan baki kerja-kerja landskap dan pemasangan ram sedang dijalankan.

Jalan Tun Razak (Titiwangsa)

Aerial view of the Titiwangsa MRT Station with the remaining landscaping and louvres installation works in progress.