January 31, 2022
Kerja-kerja pemasangan aksesori mesin tiket layan diri di aras ruang legar Stesen MRT Persiaran KLCC.

Jalan Binjai (Persiaran KLCC)

Installation of ticket vending machine accessories at Persiaran KLCC MRT Station concourse level.
January 31, 2022
Pandangan Stesen MRT Conlay menunjukkan kerja-kerja pintu kutipan tambang automatik sedang dijalankan di aras ruang legar.

Jalan Conlay (Conlay)

View of the Conlay MRT Station showing the installation of automatic fare collection gate in progress at the concourse level.
January 31, 2022

Kampung Pandan Roundabout (Intervention Shaft 2)

Aerial view of the Intervention Shaft 2, Kampung Pandan showing the overall progress completion has reached 99%.
January 31, 2022
Pandangan udara Syaf Kecemasan 3 menunjukkan kemajuannya pada 98% siap.

Jalan Peel (Escape Shaft 3)

Aerial view of the Escape Shaft 3 showing its progress at 98%.
January 31, 2022
Pandangan Stesen MRT Chan Sow Lin menunjukkan kerja-kerja pemasangan pintu Kutipan Tambang Automatik di aras ruang legar.

Jalan Chan Sow Lin (Chan Sow Lin)

View of the Chan Sow Lin MRT Station showing installation of Automatic Fare Collection gate at the concourse level.
January 31, 2022
Kerja-kerja semburan Jubin sedang dijalankan di Syaf Penyelenggaraan 3.

Jalan Chan Sow Lin (Intervention Shaft 3)

Spray tile works in progress at the Intervention Shaft 3.
January 31, 2022
Kerja-kerja mekanikal dan elektrikal sedang dijalankan di Pintu Masuk A Stesen MRT Bandar Malaysia Utara

Sungai Besi Air Force Base (Bandar Malaysia Utara)

Electrical and mechanical works ongoing at the Bandar Malaysia Utara MRT Station Entrance A.
January 31, 2022
Kerja-kerja luaran seperti kerja-kerja kemasan bangunan portal, pemasangan pagar dan pembinaan jalan sedang dijalankan di Portal Selatan.

South Portal

External works such as portal buildings finishing works, fencing installation and road construction ongoing at the South Portal.
January 31, 2022
Pengujian sistem pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Kuchai.

Jalan Kuchai Lama (Kuchai)

Testing for Automatic Fare Collection gate system in progress at the Kuchai MRT Station.