June 30, 2022
Pandangan udara Stesen MRT Taman Universiti menunjukkan kerja-kerja pembaikan untuk item kecacatan dan kerja-kerja perumputan sedang dijalankan di kawasan stesen.

Jalan Putra Permai (Taman Universiti)

Aerial view of the Taman Universiti MRT Station showing the rectification works for defect items and turfing works in progress at station area.
June 30, 2022
Pandangan udara Stesen MRT Taman Equine menunjukkan kerja-kerja jalan telah siap.

Taman Equine

Taman Equine MRT Station link bridge epoxy flooring works target to start by mid of July 2022.
June 30, 2022
Lif dan cat mural dinding telah siap di aras platform Stesen MRT Putra Permai.

Putra Permai

Station external works completed at the Putra Permai MRT Station.
June 30, 2022

Persiaran Sierra Utama (16 Sierra)

Signage installation works in progress at the 16 Sierra MRT Station boom box platform level.
June 30, 2022
Penghadang eskalator telah siap di aras platform Stesen MRT Cyberjaya Utara.

Persiaran APEC (Cyberjaya Utara)

Escalator barrier completed at the platform level of the Cyberjaya Utara MRT Station.
June 30, 2022
Pandangan udara Stesen MRT Cyberjaya City Centre menunjukkan pemeriksaan pihak berkuasa sedang dijalankan.

Persiaran APEC (Cyberjaya City Centre)

Aerial view of the Cyberjaya City Centre MRT Station showing the authority inspection in progress.
June 30, 2022
Pandangan udara Stesen MRT Putrajaya Sentral menunjukkan pemeriksaan pihak berkuasa sedang dijalankan.

Putrajaya Sentral

Aerial view of the Putrajaya Sentral MRT Station showing the authority inspection in progress.
May 20, 2022
Bilik Bekalan Kuasa Tanpa Gangguan berfungsi sepenuhnya di Stesen MRT Kentonmen

Jalan Ipoh (Kentonmen)

Uninterrupted Power Supply room fully functioning at the Kentonmen MRT Station
May 20, 2022
Kawasan laluan pejalan kaki berbumbung yang telah siap di Stesen MRT Jalan Ipoh

Jalan Ipoh (Jalan Ipoh)

The completed covered walkway area at the Jalan Ipoh MRT Station