May 20, 2022
Pengujian dan pentauliahan sistem pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Sungai Besi.

Jalan Sungai Besi (Sungai Besi)

Testing and commissioning of Automatic Fare Collection gate system in progress at the Sungai Besi MRT Station.
May 20, 2022
Kerja-kerja jejantas pejalan kaki menyeberangi Lebuhraya KL-Seremban menuju ke Pintu Masuk B Stesen MRT Serdang Raya Utara telah siap.

Jalan Serdang Raya (Serdang Raya Utara)

Works completed for the pedestrian overhead bridge crossing KL-Seremban Highway towards the Serdang Raya Utara MRT Station Entrance B
May 20, 2022
Kerja-kerja jejantas pejalan kaki menyeberangi Lebuhraya KL-Seremban menuju ke Pintu Masuk B Stesen MRT Serdang Raya Selatan telah siap

Jalan Serdang Raya (Serdang Raya Selatan)

Pedestrian overhead bridge crossing KL-Seremban Highway towards the Serdang Raya Selatan MRT Station Entrance B works completed
May 20, 2022
Kerja-kerja pembaikan dan pengujian untuk sistem Pintu Platform Automatik sedang dijalankan di Stesen MRT Serdang Jaya.

Serdang Jaya

Rectification and testing works for Automatic Platform Gate system in progress at the Serdang Jaya MRT Station.
May 20, 2022
Tempat letak kereta atas tanah peredaran jalan dalaman Stesen MRT UPM dan telah siap

Jalan UPM (UPM)

UPM MRT Station at-grade park and ride and internal road circulation completed.
May 20, 2022
Pandangan udara Stesen MRT Taman Equine menunjukkan kerja-kerja penandaan jalan telah siap

Taman Equine

Aerial view of the Taman Equine MRT Station showing the road markings works completed
May 20, 2022
Kerja-kerja pemasangan panel aluminium berlubang tambahan sebagai penghadang tempias hujan sedang dijalankan di jejantas Stesen MRT Putra Permai.

Putra Permai

Additional Aluminium Perforated Panel as rain splash barrier installation in progress at the Putra Permai MRT Station link bridge.
May 20, 2022
Lif dan cat mural dinding telah siap di aras platform Stesen MRT 16 Sierra

Persiaran Sierra Utama (16 Sierra)

Lift with wall mural painting completed at the 16 Sierra MRT Station platform level.
May 20, 2022
Pandangan udara Stesen MRT Cyberjaya Utara menunjukkan kerja-kerja luaran stesen telah siap.

Persiaran APEC (Cyberjaya Utara)

Aerial view of the Cyberjaya Utara MRT Station showing the external station works completed