March 31, 2022
Pandangan udara Stesen MRT Taman Naga Emas menunjukkan kerja-kerja luaran stesen telah siap.

Taman Naga Emas

Aerial view of the Taman Naga Emas MRT Station showing the station external works is completed.
March 31, 2022
Pandangan sambungan laluan pejalan kaki tambahan ke tempat letak kereta Stesen MRT Sungai Besi yang telah siap.

Jalan Sungai Besi (Sungai Besi)

View of the completed additional cover walkway link to Sungai Besi MRT Station park and ride.
March 31, 2022
Pandangan udara Stesen MRT Serdang Raya Utara menunjukkan kerja-kerja luaran stesen telah siap

Jalan Serdang Raya (Serdang Raya Utara)

Aerial view of the Serdang Raya Utara MRT Station showing the station external works completed
March 31, 2022
Pandangan udara Stesen MRT Serdang Raya Selatan menunjukkan kerja-kerja jalan telah siap dan sedia untuk pemeriksaan oleh Pihak Berkuasa.

Jalan Serdang Raya (Serdang Raya Selatan)

Aerial view of the Serdang Raya Selatan MRT Station showing the roadworks completed and ready for inspection by Authority.
March 31, 2022
Pandangan udara Stesen MRT Serdang Jaya menunjukkan kerja-kerja jalan telah siap dan sedia untuk pemeriksaan oleh Pihak Berkuasa.

Serdang Jaya

Aerial view of the Serdang Jaya MRT Station showing the roadworks completed and ready for inspection by the Authority.
March 31, 2022
Pemasangan sistem pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT UPM

Jalan UPM (UPM)

Installation of Automatic Fare Collection gate system in progress at the UPM MRT Station.
March 31, 2022
Kerja-kerja cat sedang dijalankan untuk dinding luaran Pintu Masuk 1 Stesen MRT Taman Equine.

Taman Equine

Painting works in progress for Taman Equine MRT Station Entrance 1 external wall.
March 31, 2022
Pemasangan peta informasi di aras ruang legar Stesen MRT 16 Sierra telah siap.

Persiaran Sierra Utama (16 Sierra)

Installation of information maps at the concourse level of the 16 Sierra MRT Station is completed.
March 31, 2022
Pengujian dan pentauliahan sistem pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Cyberjaya Utara.

Persiaran APEC (Cyberjaya Utara)

Testing and commissioning of Automatic Fare Collection gate system in progress at the Cyberjaya Utara MRT Station.