May 20, 2022
Pengujian dan pentauliahan pintu sistem Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Cyberjaya City Centre.

Persiaran APEC (Cyberjaya City Centre)

Testing and commissioning of Automatic Fare Collection gate system in progress at the Cyberjaya City Centre MRT Station.
May 20, 2022
Pengujian dan pentauliahan sistem pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Putrajaya Sentral

Putrajaya Sentral

Testing and commissioning of Automatic Fare Collection gate system in progress at the Putrajaya Sentral MRT Station.
May 14, 2022
Kerja-kerja melepa luaran di Stesen MRT Bandar Malaysia Selatan sedang dijalankan.

Sungai Besi Air Force Base (Bandar Malaysia Selatan)

External plastering works in progress at the Bandar Malaysia Selatan MRT Station.
April 23, 2022
Kerja-kerja pembaikan papak laluan sedang dijalankan di Stesen MRT Kentonmen

Jalan Ipoh (Kentonmen)

Walkway slab rectification works in progress at the Kentonmen MRT Station
April 23, 2022
Kerja-kerja pengujian dan pentauliahan sistem pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Jalan Ipoh

Jalan Ipoh (Jalan Ipoh)

Testing and commissioning of Automatic Fare Collection gate system in progress at the Jalan Ipoh MRT Station
April 23, 2022
Pandangan udara portal utara MRT Laluan Putrajaya, iaitu Syaf Kecemasan 1

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

Aerial view of the north portal of MRT Putrajaya Line, the Escape Shaft 1.
April 23, 2022
Pandangan keseluruhan Pintu Masuk B dan C Stesen MRT Sentul Barat yang telah siap.

Jalan Sultan Azlan Shah (Sentul Barat)

Overall view of the completed Entrance B and C of the Sentul Barat MRT Station.
April 23, 2022
Pengujian Pintu Kutipan Tambang Automatik di aras ruang legar Stesen MRT Titiwangsa

Jalan Tun Razak (Titiwangsa)

Automatic Fare Collection Gates testing at the concourse level of the Titiwangsa MRT Station
April 23, 2022
Laluan pejalan kaki bergerak yang telah siap dipasang dan kemasan seni bina sepanjang laluan bawah Adit A Stesen MRT Hospital Kuala Lumpur.

Jalan Tun Razak (Hospital Kuala Lumpur)

Completed travelators installation and architectural finishes along Adit A underpass of the Hospital Kuala Lumpur MRT Station.