September 29, 2022
Laluan berbumbung tambahan telah siap di Stesen MRT Putrajaya Sentral

Putrajaya Sentral

Additional covered walkway completed at the Putrajaya Sentral MRT Station.
August 31, 2022
Pandangan udara Stesen MRT Kentonmen menunjukkan kerja-kerja pembaikan kecacatan sedang dijalankan.

Jalan Ipoh (Kentonmen)

View of the platform bench at the Kentonmen MRT Station.
August 31, 2022
Pandangan bangku platform Stesen MRT Jalan Ipoh

Jalan Ipoh (Jalan Ipoh)

View of the Jalan Ipoh MRT Station platform bench.
August 31, 2022
Pandangan keseluruhan Syaf Kecemasan 1, di sepanjang Jalan Sultan Azlan Shah.

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

Overall view of the Escape Shaft 1, along Jalan Sultan Azlan Shah.
August 31, 2022
Mesin Tiket Layan Diri Stesen MRT Sentul Barat di aras ruang legar

Jalan Sultan Azlan Shah (Sentul Barat)

Sentul Barat MRT Station Ticket Vending Machine at the concourse level.
August 31, 2022
Pandangan udara Stesen MRT Titiwangsa menunjukkan kerja-kerja jalan, saliran dan perumputan sedang dijalankan.

Jalan Tun Razak (Titiwangsa)

Aerial view of the Titiwangsa MRT Station showing the road, drainage and turfing works in progress
August 31, 2022
Kemasan seni bina telah siap di aras ruang legar kawasan berbayar dan tidak berbayar di Stesen MRT Hospital Kuala Lumpur.

Jalan Tun Razak (Hospital Kuala Lumpur)

Completed architecture finishes at the concourse level of the unpaid and paid area of the Hospital Kuala Lumpur MRT Station .
August 31, 2022
Pandangan kerja-kerja landskap, jalan dan saliran yang telah siap di Syaf Penyelenggaraan 1

Jalan Tun Razak (Intervention Shaft 1)

View of the completed landscaping, road and drainage works at the Intervention Shaft 1.
August 31, 2022
Bangku-bangku platform sedia untuk dipasang di aras platform Stesen MRT Raja Uda.

Jalan Raja Muda Abdul Aziz (Raja Uda)

Platform benches ready to be installed at the platform level of the Raja Uda MRT Station.