March 31, 2022
Kerja-kerja pemasangan sesekat siling sedang dijalankan di Stesen MRT Conlay.

Jalan Conlay (Conlay)

Baffle ceiling installation in progress at the Conlay MRT Station.
March 31, 2022
Pandangan udara Syaf Penyelenggaraan 2 menunjukkan kerja-kerja jalan luaran, saliran dan landskap sedang dijalankan.

Kampung Pandan Roundabout (Intervention Shaft 2)

Aerial view of the Intervention Shaft 2 showing the external road, drainage and landscaping works in progress.
March 31, 2022
Pengujian terakhir dan pembaikan perkhidmatan mekanikal dan elektrikal sedang dijalankan di Syaf Kecemasan 3.

Jalan Peel (Escape Shaft 3)

Final testing and repair of the electrical and mechanical services in progress within Escape Shaft 3.
March 31, 2022
Pengujian dan pentauliahan pintu Kutipan Tambang Automatik sedang dijalankan di Stesen MRT Chan Sow Lin.

Jalan Chan Sow Lin (Chan Sow Lin)

Testing and commissioning of Automatic Fare Collection gates at the Chan Sow Lin MRT Station in progress.
March 31, 2022
Pandangan Syaf Penyelenggaraan 3 menunjukkan pemasangan semua perkhidmatan telah siap di aras tanah dalam bangunan.

Jalan Chan Sow Lin (Intervention Shaft 3)

View of the Intervention Shaft 3 showing the installation of all services completed at the ground floor within the building.
March 31, 2022
Pandangan udara Stesen MRT Bandar Malaysia Utara menunjukkan kerja-kerja kambus balik di Pintu Masuk A sedang dijalankan.

Sungai Besi Air Force Base (Bandar Malaysia Utara)

Aerial view of the Bandar Malaysia Utara MRT Station showing the backfilling works at the Entrance A in progress.
March 31, 2022
Kerja-kerja pemasangan papan gentian siling sedang dijalankan di aras legar Stesen MRT Bandar Malaysia Selatan.

Sungai Besi Air Force Base (Bandar Malaysia Selatan)

Ceiling fibreboard installation works in progress at the concourse level of the Bandar Malaysia Selatan MRT Station.
March 31, 2022
Kerja-kerja kemasan dinding dan pembaikan susur tangan sedang dijalankan di Portal Selatan

South Portal

Wall finishes and railing rectification works in progress at the South Portal.
March 31, 2022
Kawasan menurunkan dan mengambil penumpang serta kawasan teksi telah siap di Stesen MRT Kuchai.

Jalan Kuchai Lama (Kuchai)

Drop-off and pick-up passenger area as well as taxi area completed at the Kuchai MRT Station.