July 7, 2022
OPENING REMARK: MRT Corp Head of Standard and Compliance Encik Azhar Sofah delivered the opening remark during the OSHE Conference 2022 at the KVMRT Training Centre.

OSHE CONFERENCE 2022

The recent Occupational Safety, Health, and Environment (OSHE) Conference 2022 was jointly organised by Malaysia Rapid Transit Corporation (MRT Corp) Sdn Bhd and the Turnkey Contractor for the MRT Putrajaya (PY) Line Project, MMC Gamuda KVMRT (PDP SSP) Sdn Bhd on 7 July 2022 at the KVMRT Training Centre, Sungai Buloh.
June 16, 2022
MEMASUKI STESEN: (dua dari kiri) Perdana Menteri YAB Dato' Sri Ismail Sabri Yaakob mengetik masuk di pintu masuk Stesen MRT Kampung Batu, bersama beliau (dari kiri) Menteri Kewangan YB Senator Tengku Datuk Seri Utama Zafrul Tengku Abdul Aziz, Menteri Pengangkutan YB Datuk Sri Ir. Dr Wee Ka Siong, Ketua Pegawai Eksekutif MRT Corp YBhg Datuk Mohd Zarif Hashim dan Pengerusi Prasarana Malaysia Berhad YBhg Tan Sri Jamaludin Ibrahim.

MRT PUTRAJAYA LINE PHASE ONE OPENED TO THE PUBLIC

Phase One of the MRT Putrajaya Line, the second line of the Klang Valley MRT network, was opened to the public on 16 June 2022.
April 5, 2022
PERTUKARAN DOKUMEN: (kiri) Datuk Bandar Kuala Lumpur Datuk Seri Hj. Mahadi Che Ngah dan (kanan) Ketua Pegawai Eksekutif MRT Corp Datuk Mohd Zarif Hashim bertukar dokumen MoU bagi menyempurnakan majlis, disaksikan oleh (tengah) Menteri Wilayah Persekutuan Dato' Seri Dr Shahidan Kassim.

MRT CORP AND DBKL SIGN MOU

A Memorandum of Understanding (MoU) was signed between Dewan Bandaraya Kuala Lumpur (DBKL) and Malaysia Rapid Transit Corporation Sdn Bhd (MRT Corp) to form a strategic partnership in developing the city of Kuala Lumpur to be a “City for All”, during a simple ceremony held at Menara DBKL 1, on 5 April 2022.
April 5, 2022
KEMAJUAN PROJEK: Pengarah Projek MRT Laluan Putrajaya MRT Corp Dato’ Amiruddin Ma’aris (kanan) memberikan maklumat terkini mengenai Projek MRT kepada Naib Menteri Pengangkutan Republik Korea, Encik Hwang Seong Kyu (dua dari kiri

KOREAN REPUBLIC VICE MINISTER FOR TRANSPORT VISITS MRT PY LINE

The Korean Republic Vice Minister for Transport, Mr. Hwang Seong Kyu visited the MRT Putrajaya (PY) Line on 5 April 2022 for a better understanding of the construction and planning of the train system.
March 29, 2022
Taklimat mengenai kemajuan semasa pembinaan oleh Encik Asnan Ayob Ketua Sivil dan Pembinaan RTS Link

VISIT BY MINISTRY OF TRANSPORT AND APAD TO RTS LINK PROJECT

The Rapid Transit System Link Project welcomed a delegation from the Ministry of Transport (MOT) and Land Public Transport Agency (APAD) to several of the project sites in Johor Bahru on 29 March 2022.
February 10, 2022
PENERANGAN: Penduduk Kampung Wadihana mendengar penerangan keseluruhan Projek Link RTS dan taklimat mengenai permulaan kerja-kerja pembinaan di depoh penyelenggaraan Wadihana.

ENGAGEMENT SESSION WITH KAMPUNG WADIHANA RESIDENTS

An engagement session with the residents of Kampung Wadihana was organised by the Rapid Transit System Link (RTS Link) Project on 10 February 2022 at Dewanraya Wadihana, Johor Bahru.