ProjectsPutrajaya LineProject Updates

Project Updates

The Putrajaya Line Project Updates provides the latest project construction progress updates based on the type of alignment and location of the sites. You may also view the locations and status of project from our Project Interactive Map.

Sungai Besi Air Force Base (Bandar Malaysia North)

July 2019

View of the cross passage at the Chan Sow Lin Section of tunnel being excavated …

Sungai Besi Air Force Base (Bandar Malaysia South)

July 2019

Rock hacking works for final excavation level in progress at the Bandar Malaysia…

South Portal

July 2019

Ongoing excavation works at the South Portal.…

Jalan Kuchai Lama (Kuchai Lama)

July 2019

Ongoing T-beam launching works at the Kuchai Lama MRT Station site.…

KL-Seremban Highway

July 2019

Aerial view of the micro tunnelling works in progress at the underpass near the …

Jalan Sungai Besi (Sungai Besi)

July 2019

Bearing grouting in progress at the Sungai Besi MRT Station site.…

Jalan Serdang Raya (Serdang Raya North)

July 2019

Aerial view of the completed launching of segmental box girder and preparation o…

Jalan Serdang Raya (Serdang Raya South)

July 2019

Ongoing segmental box girder erection works at the Serdang Raya South MRT Statio…

Seri Kembangan

July 2019

Aerial view of Seri Kembangan MRT Station site showing building construction in …

Jalan UPM (UPM)

July 2019

Aerial view of the UPM MRT Station site showing the station concourse constructi…

Serdang Depot

July 2019

Overall view of the Serdang Depot showing the stabling yard (left), rolling stoc…

Equine Park

July 2019

View of the parapet wall installation in progress at the Equine Park MRT Station…

Taman Putra Permai

July 2019

Ongoing launching works for segmental box girder to southbound line towards Tama…

Persiaran Sierra Utama (16 Sierra)

July 2019

View of the installation of steel structure station truss at the 16 Sierra MRT S…

Persiaran APEC (Cyberjaya North)

July 2019

View of the parapet wall and noise barrier installation works in progress at the…