ProjectsPutrajaya LineProject Updates

Project Updates

The Putrajaya Line Project Updates provides the latest project construction progress updates based on the type of alignment and location of the sites. You may also view the locations and status of project from our Project Interactive Map.

Jalan Kuala Selangor (Damansara Damai)

December 2019

Electrical and Mechanical cable containment in progress at the Entrance A and B …

Jalan Kuala Selangor (Sri Damansara Barat)

December 2019

Installation of steel structure in progress at the Entrance B and Electrical and…

Persiaran Dagang (Sri Damansara Sentral)

December 2019

Installations of double skin wall and lift glass in progress at the Sri Damans…

Jalan Kepong (Sri Damansara Timur)

December 2019

Installation of roof structure and covering are 75% completed. External works su…

Jalan Kepong (Kepong Baru)

December 2019

Aerial view of the Kepong Baru MRT Station showing external works such as retain…

Jalan Kepong (Jinjang)

December 2019

Installation of roof structure and covering are 60% completed. External works su…

Jalan Kepong (Sri Delima)

December 2019

Bullnose for roofing works in progress at the Sri Delima MRT Station.…

Jalan Ipoh (Jalan Ipoh)

December 2019

Ongoing secant bore piling and portal beam works at the Jalan Ipoh MRT Station.…

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

December 2019

Aerial view of the Escape Shaft 1 showing the temporary opening for Tunnel Borin…

Jalan Sultan Azlan Shah (Sentul Barat)

December 2019

Overall view of the Sentul Barat MRT Station …

Jalan Tun Razak (Titiwangsa)

December 2019

Aerial view of the Titiwangsa MRT Station site.…

Jalan Tun Razak (Hospital Kuala Lumpur)

December 2019

Aerial view of the Hospital Kuala Lumpur MRT Station site showing the ongoing co…

Jalan Tun Razak (Intervention Shaft 1)

December 2019

Aerial view of the Intervention Shaft 1.…

Jalan Raja Muda Abdul Aziz (Raja Uda)

December 2019

Overall view of rapid construction works in progress at the Raja Uda MRT Station…

Jalan Tun Razak (Ampang Park)

December 2019

View of the layer 1 strutting system installation to support diaphragm wall duri…