The Putrajaya Line Project Updates provides the latest project construction progress updates based on the type of alignment and location of the sites. You may also view the locations and status of project from our Project Interactive Map.

Jalan Peel (Escape Shaft 3)

March 2020

Aerial view of the Escape Shaft 3 with completion at 72.25%.…

Jalan Chan Sow Lin (Chan Sow Lin)

March 2020

Overall view of the Chan Sow Lin MRT Station site.…

Jalan Chan Sow Lin (Intervention Shaft 3)

March 2020

Underground shaft external wall casting works at the Intervention Shaft 3.…

Sungai Besi Air Force Base (Bandar Malaysia Utara)

March 2020

Aerial view of the Bandar Malaysia Utara MRT Station showing the construction of…

Sungai Besi Air Force Base (Bandar Malaysia Selatan)

March 2020

Aerial view of the Bandar Malaysia Selatan MRT Station.…

South Portal

March 2020

View of the ongoing Tunnel Boring Machine retrieval shaft roof slab works at the…

Jalan Kuchai Lama (Kuchai)

March 2020

Aerial view of the Kuchai MRT Station site showing the ongoing construction work…

Taman Naga Emas

March 2020

Block wall for architecture finishing for riser next to the lift core in progres…

KL-Seremban Highway

March 2020

Aerial view of the underpass near the KL-Seremban Highway showing preparation wo…

Jalan Sungai Besi (Sungai Besi)

March 2020

Installation of steel structure for portal frame at the station box of the Sunga…

Jalan Serdang Raya (Serdang Raya Utara)

March 2020

Concreting lift wall works in progress at the platform level of the Serdang Raya…

Jalan Serdang Raya (Serdang Raya Selatan)

March 2020

Steel structure works in progress at the Serdang Raya Selatan MRT Station.…

Serdang Jaya

March 2020

Ongoing station structure works at the Serdang Jaya MRT Station site.…

Jalan UPM (UPM)

March 2020

Aerial view of the UPM MRT Station site showing the installation of roof truss a…

Serdang Depot

March 2020

Aerial view of the Serdang Depot showing the drainage works in progress at zone …