Project Updates

The Sungai Buloh-Serdang-Putrajaya Line Project Updates provides the latest project construction progress updates based on the type of alignment and location of the sites. You may also view the locations and status of project from our Project Interactive Map.

Jalan Tun Razak (Titiwangsa)

31 July 2019

Aerial view of the gantry crane setup at the Titiwangsa MRT Station site.…

Jalan Tun Razak (Hospital Kuala Lumpur)

31 July 2019

View of the construction works for reinforced concrete at Hospital Kuala Lumpur …

Jalan Tun Razak (Intervention Shaft 1)

31 July 2019

View of the completed tunnel section from Hospital Kuala Lumpur Crossover to Amp…

Jalan Raja Muda Abdul Aziz (Kampung Baru North)

31 July 2019

Aerial view of Kampung Baru North MRT Station site showing the roof slab and con…

Jalan Gurney (Escape Shaft 2)

31 July 2019

Ongoing ground work treatment and wet soil mixing and testing at the Escape Shaf…

Jalan Tun Razak (Ampang Park)

31 July 2019

Aerial view of installation of steel struts between plant room and upper platfor…

Jalan Binjai (KLCC East)

31 July 2019

View of the station box, concourse level and upper under platform slab reinforce…

Jalan Conlay (Conlay)

31 July 2019

Aerial view of the Conlay MRT Station site.…

Kampung Pandan Roundabout (Intervention Shaft 2)

31 July 2019

Formwork installation for south bound at the Intervention Shaft 2 site.…

Jalan Peel (Escape Shaft 3)

31 July 2019

View of the surface preparation for waterproofing membrane installation at the E…

Jalan Chan Sow Lin (Chan Sow Lin)

31 July 2019

Ongoing tunnel boring machine launching setup at the Chan Sow Lin MRT Station si…

Jalan Chan Sow Lin (Intervention Shaft 3)

31 July 2019

Shaft and tunnels adit excavation works at the Intervention Shaft 3 site.…

Sungai Besi Air Force Base (Bandar Malaysia North)

31 July 2019

View of the cross passage at the Chan Sow Lin Section of tunnel being excavated …

Sungai Besi Air Force Base (Bandar Malaysia South)

31 July 2019

Rock hacking works for final excavation level in progress at the Bandar Malaysia…

South Portal

31 July 2019

Ongoing excavation works at the South Portal.…