ProjectsPutrajaya LineProject Updates

Project Updates

The Putrajaya Line Project Updates provides the latest project construction progress updates based on the type of alignment and location of the sites. You may also view the locations and status of project from our Project Interactive Map.

Persiaran Sierra Utama (16 Sierra)

May 2022

Lift with wall mural painting completed at the 16 Sierra MRT Station platform le…

Persiaran APEC (Cyberjaya Utara)

May 2022

Aerial view of the Cyberjaya Utara MRT Station showing the external station work…

Persiaran APEC (Cyberjaya City Centre)

May 2022

Testing and commissioning of Automatic Fare Collection gate system in progress a…

Putrajaya Sentral

May 2022

Testing and commissioning of Automatic Fare Collection gate system in progress a…

Sungai Besi Air Force Base (Bandar Malaysia Selatan)

May 2022

External plastering works in progress at the Bandar Malaysia Selatan MRT Station…

Jalan Ipoh (Kentonmen)

April 2022

Walkway slab rectification works in progress at the Kentonmen MRT Station…

Jalan Ipoh (Jalan Ipoh)

April 2022

Testing and commissioning of Automatic Fare Collection gate system in progress …

Jalan Sultan Azlan Shah (Escape Shaft 1, North Portal)

April 2022

Aerial view of the north portal of MRT Putrajaya Line, the Escape Shaft 1.…

Jalan Sultan Azlan Shah (Sentul Barat)

April 2022

Overall view of the completed Entrance B and C of the Sentul Barat MRT Station.…

Jalan Tun Razak (Titiwangsa)

April 2022

Automatic Fare Collection Gates testing at the concourse level of the Titiwangsa…

Jalan Tun Razak (Hospital Kuala Lumpur)

April 2022

Completed travelators installation and architectural finishes along Adit A under…

Jalan Tun Razak (Intervention Shaft 1)

April 2022

Aerial view of the Intervention Shaft 1 showing the louvres installation, turfin…

Jalan Raja Muda Abdul Aziz (Raja Uda)

April 2022

Interior view of the completed final finishes at the concourse level of Raja Uda…

Jalan Gurney (Escape Shaft 2)

April 2022

Installation of battery supply is completed in the Escape Shaft 2 uninterruptibl…

Jalan Tun Razak (Ampang Park)

April 2022

Cladding works at the upper concourse void area of the Ampang Park MRT Station.…