Jalan Kampung Batu (Kampung Batu)

31 October 2017

Aerial view of piers construction at the upcoming Kampung Batu Station site.…

Putrajaya Sentral

19 February 2017

Ongoing piling works at the Putrajaya Sentral MRT Station site.…

Serdang Depot

18 February 2017

Aerial view of cut and fill earthworks at the Serdang Depot site.…

Sungai Besi Airforce (Bandar Malaysia North)

17 February 2017

Ongoing preparation work at the future Bandar Malaysia North Station site.…

Jalan Peel (Escape Shaft 3)

16 February 2017

Almost completed levelling works at the Escape Shaft 3 site for site laydown.…

Jalan Conlay (Conlay)

15 February 2017

Ongoing concrete slab works surrounding the station box at the future Conlay Sta…

Jalan Tun Razak (Ampang Park)

14 February 2017

A hydrofraise being prepared for Diaphragm Wall construction at the future Ampan…

Jalan Raja Muda Abdul Aziz (Kampung Baru North)

13 February 2017

View of the future Kampung Baru North Station site with New Jersey Barriers arra…

Lorong Raja Muda Abdul Aziz

12 February 2017

View of ongoing site preparation works within site for the construction of the C…

Jalan Tun Razak (Titiwangsa)

11 February 2017

Secant Bored Pile excavation and Diaphragm Wall works ongoing at the future Titi…

Jalan Sultan Azlan Shah (Sentul West)

10 February 2017

Preparation for traffic diversion for the construction of the future Sentul West…

Jalan Kampung Batu (Kampung Batu)

9 February 2017

View of construction work for the future Kampung Batu MRT Station in the Kampung…

Jalan Kepong

8 February 2017

Bored piling works in progress along Jalan Kepong in Jinjang.…

Jalan Kepong

7 February 2017

View of bored piling works at the future Kepong Baru Station site beside Jalan K…

Jalan Kepong

6 February 2017

View of bored piling, pile cap and pier column works at the future Metro Prima S…