LONG-TERM INTERMITTENT PARTIAL NIGHT LANE CLOSURES ALONG JALAN MAGAZINE (KOMTAR)
3 Jun
2026
31 Jul
2026

Activity Time
12.00 am – 6.00 am

Description

Please be informed that a long-term periodic partial lane closure along Jalan Magazine at night will be implemented from 3 June 2026 to 31 July 2026, between 12:00 AM and 6:00 AM, over a period of 59 days.

Activity

UTILITY RELOCATION


SHORT TERM PARTIAL LANE CLOSURES ON LEBUHRAYA TUN DR. LIM CHONG EU (SG. PINANG)
1 Jun
2026
31 Jul
2026

Activity Time
12.00 am – 6.00 am

Description

Please be informed that a periodic partial lane closures at night on the Tun Dr. Lim Chong Eu Highway will be implemented from 1 June 2026 to 31 July 2026. The closures will be carried out between 12:00 AM (midnight) and 6:00 AM, over a period of 61 days.

Activity

PILOTING & UTILITY DETECTION


SHORT-TERM INTERMITTENT PARTIAL NIGHT LANE CLOSURE AT GAT JALAN MAGAZINE (KOMTAR)
1 Jun
2026
31 Jul
2026

Activity Time
12.00 am – 6.00 am

Description

Please be informed that a periodic partial closure of the pedestrian walkway at Gat Jalan Magazine will be implemented from 1 June 2026 to 31 July 2026. The closure will be carried out between 12:00 AM and 6:00 AM, over a period of 61 days.

Activity

RELOCATION OF UTILITY


SHORT-TERM PARTIAL DAYTIME LANE CLOSURE ON TUN DR. LIM CHONG EU HIGHWAY. (BANDAR SRI PINANG)
1 Jun
2026
31 Jul
2026

Activity Time
10.00 am – 4.00 pm

Description

Please be informed that periodic partial closures of the inner lane during the day on the Tun Dr. Lim Chong Eu Highway will be implemented from 1 June 2026 to 31 July 2026. The closures will be carried out between 10:00 AM and 4:00 PM.

Activity

Tree cutting works


LONG-TERM PARTIAL ROAD CLOSURE AT GAT JALAN MAGAZINE AND LEBUH CARNARVON
1 Jun
2026
30 Jun
2026

Activity Time
24 Hours

Description

Please be informed a 24-hour long-term partial lane closure will be implemented daily from Gat Jalan Magazine to Lebuh Carnarvon from 1 June 2026 to 30 June 2026.

Activity

BORED PILING WORKS


LONG-TERM INTERMITTENT PANTAI NIGHT LANE CLOSURE AT JALAN SULTAN AZLAN SHAH (GELUGOR)
1 Jun
2026
31 Jul
2026

Activity Time
9.00 am – 5.00 pm

Description

Please be informed that periodic night-time partial lane closures in both directions on Jalan Sultan Azlan Shah (heading towards Bayan Lepas and Komtar) will be implemented from 1 June 2026 to 31 July 2026. The closures will be carried out between 9:00 PM and 5:00 AM, over a period of 55 days.

Activity

EXCAVATION & RELOCATION OF UTILITY (PBA)


IMPLEMENTATION OF LONG-TERM FREE-FLOW TRAFFIC AT JALAN TENGAH – JALAN SULTAN AZLAN SHAH INTERSECTION
16 May
2026
31 Dec
2028

Activity Time
24 Hours

Description

Please be informed that the long-term implementation of free-flow traffic movement will be carried out at the Jalan Tengah – Jalan Sultan Azlan Shah intersection from 16 May 2026 until 31 December 2028.

Activity

Bored Pile, Pile Cap And Structure Works


LONG-TERM INTERMITTENT NIGHT-TIME CLOSURE OF THE SLIP ROAD FROM JALAN SULTAN AZLAN SHAH TO SUNGAI TIRAM (SUNGAI TIRAM)
18 May
2026
13 Jul
2026

Activity Time
10.00PM – 5.00AM

Description

Please be informed that a long-term intermittent partial night road closure and traffic diversion will be implemented near the Perkampungan Polis Bayan Indah from 18 May 2026 until 13 July 2026, between 10:00 PM and 5:00 AM, over a period of 55 days.

Activity

Road Widening Works At Police Quarters Bayan Lepas


LONG-TERM INTERMITTENT PARTIAL LANE CLOSURES ALONG JALAN KAMPUNG RELAU DAN JALAN TUN DR AWANG (PICC – SMK SG. NIBONG)
14 May
2026
31 Jul
2026

Activity Time
8.00AM – 4.00PM

Description

Please be informed that long-term intermittent partial lane closures along a stretch of Jalan Kampung Relau (both directions) and Jalan Tun Dr Awang (both directions) will be implemented from 14 May 2026 to 31 July 2026. The closure will be implemented from 8:00 am to 4:00 pm, over a period of 79 days.

Activity

Drainage And Road Widening Works.