ProjectsTraffic Announcement

Traffic Announcement

LONG-TERM INTERMITTENT PARTIAL NIGHT LANE CLOSURE ALONG JALAN TUN DR. AWANG (HUNZA MUZE PICC – HUNZA PROPERTIES BERHAD)
13 Apr
2026
31 May
2026

Activity Time
10.00PM – 5.00AM

Description

Please be informed that a long-term periodic partial lane closure will be implemented along Jalan Tun Dr. Awang from 13 April 2026 to 31 May 2026, between 10:00 PM and 5:00 AM, over a period of 49 days.

Activity

Identify And Relocation Utilities


LONG-TERM INTERMITTENT PARTIAL NIGHT LANE CLOSURE ALONG JALAN SULTAN AZLAN SHAH. (B BRAUN MEDICAL – DYNACRAFT INDUSTRIES)
1 May
2026
30 Jun
2026

Activity Time
10.00PM – 5.00AM

Description

Please be informed that a long-term partial night lane closure will be implemented on Jalan Sultan Azlan Shah, from 1 May 2026 to 30 June 2026. The closure period will be between 10:00 pm and 5:00 am, over a period of 61 days.

Activity

Preliminary Utility Works.


CONTINUATION OF THE ROAD DIVERSION FROM JALAN TEBRAU TOWARDS JALAN TUN ABDUL RAZAK VIA LEFT SLIP ROAD AT JALAN WONG AH FOOK, JOHOR BAHRU
1 May
2026
31 Oct
2026

Activity Time
24 hours

Description

Activity

To facilitate the machine mobilization works, deck slab works, piling works, RE wall works, roadworks, Drainage works and other RTS Link project-related works


CONTINUATION OF LEFT LANE CLOSURE AT JALAN TUN ABDUL RAZAK, JOHOR BAHRU (NEAR JB SENTRAL, DANGA BAY-BOUND
3 May
2026
31 May
2026

Activity Time
24 Hours

Description

Activity

To facilitate the machine mobilization works, launching works, deck slab works, roofing works, finishing works and other RTS Link project-related works.


CONTINUATION OF INTERMITTENT LEFT LANE CLOSURE AT JALAN TUN ABDUL RAZAK, JOHOR BAHRU (CITY CENTRE-BOUND)
3 May
2026
2 Jul
2026

Activity Time
10.00 PM – 5.30 AM

Description

Please be informed that the intermittent left lane closure at Jalan Tun Abdul Razak (City Centre-bound), will be
extended from 3 May 2026 to 2 July 2026. The construction works will be carried out from 10:00 PM to 5:30 AM
for a duration of two (2) months.

Activity

To facilitate machine mobilization works, launching works, concrete and drainage works, retaining wall construction works, road maintenance works, and other RTS Link project related works.


CONTINUATION OF RIGHT LANE CLOSURE AT JALAN TUN ABDUL RAZAK, JOHOR BAHRU (NEAR JOHOR TOWER HARN LEN, SKUDAI/SENAI-BOUND)
1 May
2026
31 May
2026

Activity Time
24 hours

Description

Activity

To facilitate deck slab works, installation of falsework, external ramp construction works and other RTS Link project-related works.


CONTINUATION OF INTERMITTENT FULL ROAD CLOSURE ALONG JALAN GEREJA, JALAN NGEE HENG, AND JALAN TRUS, JOHOR BAHRU
1 May
2026
31 May
2026

Activity Time
10.00 PM – 5.30 AM

Description

Please be informed that the intermittent full road closure at Jalan Gereja, Jalan Ngee Heng, and Jalan Trus will
be extended from 1 May 2026 to 31 May 2026. The works will be carried out from 10.00 PM to 5.30 AM for a
duration of one (1) month.

Activity

To facilitate construction machinery mobilization works, concreting works, drainage works,parapet wall works, road line marking works, repair works and other RTS Link project related works.


CONTINUATION OF FULL ROAD CLOSURE ALONG JALAN GEREJA (NEAR JOHOR TOWER HARN LEN) AND ACTIVATION OF U-TURN FROM JALAN TUN ABDUL RAZAK TO JALAN NGEE HENG, JOHOR BAHRU
1 May
2026
31 May
2026

Activity Time
24 hours

Description

Please be informed that the full road closure at Jalan Gereja, near Johor Tower Harn Len and the activation of
the U-turen from Jalan Tun Abdul Razak to Jalan Ngee Heng will be extended from 1 May 2026 to 31 May 2026.
The works will be carried out for 24 hours for a duration of one (1) month.

Activity

To facilitate construction machinery mobilization works, concreting works, drainage works, road line marking works, reinstatement works and other RTS Link project-related works.


LONG-TERM LANE DIVERSION ON JALAN SULTAN AZLAN SHAH (JPJ BATU UBAN – SUNNY POINT)
25 Apr
2026
30 Nov
2026

Activity Time
24 Hours

Description

Please be informed that long-term lane diversion on Jalan Sultan Azlan Shah (both directions) will be implemented from 25 April 2026 to 30 November 2026, on a 24-hour basis, over a period of 220 days.

Activity

Bored Piling And Permanent Structure Works