July 31, 2021
DIVAKSINASI: Penduduk PPR Lembah Subang menunjukkan bukti vaksinasi mereka semasa perjalanan pulang ke kediaman mereka menaiki Bas Perantara MRT Laluan Putrajaya

MRT CORP CONTINUES TRANSPORTATION FOR COVID-19 VACCINATION

Malaysia Rapid Transit Corporation Sdn Bhd (MRT Corp) continued its collaboration with University Malaya Medical Centre (UMMC) by transporting residents of Pusat Perumahan Rakyat (PPR) Lembah Subang to the UMMC Vaccination Centre on 30 July 2021.
July 23, 2021
MENYEMAK JARUM: Doktor perubatan menunjukkan jarum suntikan kepada anggota RC Deaf Missions Malaysia sebelum memberikan suntikan vaksin Covid-19 kepadanya di Pusat Perubatan Universiti Malaya.

MRT PUTRAJAYA LINE FEEDER BUSES TRANSPORT RC DEAF MISSIONS MALAYSIA FOR VACCINATION

Two MRT Putrajaya Line Feeder Buses were mobilised to transport members of the RC Deaf Missions Malaysia (RCDM) to University Malaya Medical Centre (UMMC) for their Covid-19 vaccination on 23 July 2021.
May 4, 2021
WINNERS: Winners of the TRANSEAT - MRT Putrajaya Line Underground Stations Bench Design Competition with their mock cheques and certificates, where their respective bench designs have secured them a placement in the competition.

INFINITY WINS TRANSEAT GRAND PRIZE

INFINITY, the design by Jaihar Jailani Ismail and Noor Syahidah Abdullah won the grand prize of RM10,000.00 in the TRANSEAT - The MRT Putrajaya Line Underground Stations Bench Design Competition.
April 23, 2021

RM135 MIL IN COMPENSATION MADE OUT TO LANDOWNERS

A cheque presentation ceremony was held on 19 April 2021 for the payment of compensation for land acquired for the Rapid Transit System Link (RTS Link) between Johor Bahru and Singapore.
April 19, 2021
KESELURUHAN: Pengarah Projek MRT3 Laluan Lingkaran Tuan Haji Mohd Yusof Kasiron menyampaikan keseluruhan cadangan Projek MRT3 Laluan Lingkaran.

MRT CORP CONDUCTS RFI BRIEFING SESSION FOR MRT3 CIRCLE LINE PROJECT

Malaysia Rapid Transit Corporation Sdn. Bhd. (MRT Corp) organised a briefing in conjunction with its Request for Information (RFI) exercise for the proposed MRT3 Circle Line Project on 19 April 2021.
April 13, 2021
TOD dan Pertumbuhan Semula Bandar: Salah satu pandangan yang dikongsi oleh Ketua Pegawai Eksekutif MRT Corp, Datuk Mohd Zarif Hashim mengenai MRT3 Laluan Lingkaran adalah mengenai Pembangunan Berorientasikan Transit (TOD) dan pertumbuhan semula bandar.

INSIGHTS: MRT3 CIRCLE LINE

The MRT3 Circle Line Project was introduced to the members of media, consultants, industry players and other stakeholders in a session organised by Malaysia Rapid Transit Corporation Sdn Bhd (MRT Corp) on 13 April 2021.
April 12, 2021
DISAHKAN KEMAMPANAN INFRASTAR: Sijil Kemampanan INFRASTAR 5 Bintang sedang disampaikan oleh Ketua Eksekutif Lembaga Pembangunan Industri Pembinaan Malaysia, Datuk Ir Ahmad ‘Asri Abdul Hamid (kiri) kepada Ketua Pegawai Eksekutif MRT Corp, Datuk Mohd Zarif Hashim (kanan).

MRT CORP ACHIEVES 5-STAR SUSTAINABLE INFRASTAR RATING

A ceremony to present the 5-Star Sustainable INFRASTAR certificate to Malaysia Rapid Transit Corporation Sdn Bhd (MRT Corp) was held on 12 April 2021 at the KVMRT Training Centre, Sungai Buloh.
April 3, 2021
SEMUA BAIK: Delegasi pemeriksaan ketersediaan operasi MRT Laluan Putrajaya Fasa Satu memberikan tanda semua baik dengan latar belakang tren MRT dan pandangan panorama Kuala Lumpur. Dari kiri ke kanan: Ketua Pengarah Agensi Pengangkutan Awam Darat Encik Azlan Shah Al Bakri, Timbalan Ketua Setiausaha Kementerian Pengangkutan Puan Normah Osman, Timbalan Menteri Kewangan I Datuk Abd Rahim Bakri, Ketua Setiausaha Kementerian Pengangkutan Datuk Isham Ishak, Menteri Pengangkutan Datuk Seri Ir. Dr. Wee Ka Siong, Datuk Bandar Kuala Lumpur Datuk Seri Mahadi Che Ngah, dan Ketua Pegawai Eksekutif MRT Corp Datuk Mohd Zarif Hashim.

TRANSPORT MINISTER AND DEPUTY FINANCE MINISTER I INSPECT MRT PUTRAJAYA LINE PHASE ONE OPERATION READINESS

Transport Minister Datuk Seri Ir. Dr. Wee Ka Siong and Deputy Finance Minister I Datuk Abd Rahim Bakri on 3 April 2021 visited the Phase One section of the MRT Putrajaya (PY) Line to check on its readiness for operation.
March 17, 2021
MENGANGKAT: Aktiviti mengangkat gerabak tren terakhir TS49 ke atas trak untuk dibawa ke pelabuhan di Masan.

THE LAST MRT PUTRAJAYA LINE TRAIN CARS ROLL OUT FROM FACTORY IN SOUTH KOREA

The cars for the last two train sets of the MRT Putrajaya (PY) Line, called Train No TS48 and TS49, rolled out from the Hyundai -Rotem factory in Changwon, South Korea on 17 March 2021.