Traffic Announcements

Location
Description
Start Date
End Date
Time
Activity
Download

SSP Line
Jalan Kuching
Continuation of night lane closures along Jalan Kuching & slip road opposite Sekolah Menengah Kebangsaan Dato' Ibrahim Yaacob.
20 October 2017
17 January 2018
10pm - 6am
To facilitate loading/unloading material, site clearing and tree cutting, piloting, utilities relocation, soil investigation, slip road realignment, bore piling works and any other related works to MRT Project.

SSP Line
Jalan Sultan Azlan Shah (near Kompleks Mutiara)
Continuation of night lane closures by stages along Jalan Sultan Azlan Shah (near Kompleks Mutiara).
20 October 2017
17 January 2018
10pm - 6am
To facilitate loading/unloading material, tree cutting, piloting, soil investigation, utilities relocation, drainage works, retaining wall, road curb demolition, road widening and box culvert works for MRT construction works.

SSP Line
Jalan Sultan Azlan Shah (near Pos Malaysia)
Continuation of night lane closures by stages along Jalan Sultan Azlan Shah (near Pos Malaysia).
20 October 2017
17 January 2018
10pm - 6am
To facilitate loading/unloading material, tree cutting, piloting, soil investigation, utilities relocation, drainage works, retaining wall, road curb demolition, road widening and box culvert works for MRT construction works.

SSP Line
Jalan Putra Permai (Puchong-bound)
Continuation of left most lane closure along Jalan Putra Permai (Puchong-bound).
18 October 2017
17 January 2018
24 hours
To facilitate site Mapping and Piloting, Soil Investigation, Survey, Utilities Relocation, Sheet Pile Installation, Bore Pile, Pile Cap, and any related works.

SSP Line
Jalan Putra Permai
Continuation of slip road closure along Jalan Putra Permai towards Giant Hypermarket.
18 October 2017
17 January 2018
24 hours daily
To facilitate site Mapping and Piloting, Soil Investigation, Survey, Utilities Relocation, Sheet Pile Installation, Bore Pile, Pile Cap, and any related works.

SSP Line
Jalan Kuala Selangor
Continuation of long-term one lane closure by stages for a stretch of 500 metres along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound).
15 October 2017
31 December 2017
10:00pm 6:00am; 10:00pm 10:00am
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, piloting and mapping, utilities relocation, temporary works (sheet pile and earth work), bore piling work, pile cap, and survey works for MRT construction.

SBK Line
Taman Kota Cheras
Continuation of lane closure on the slip road from Taman Kota Cheras entering the Cheras Kajang Highway (Kuala Lumpur-bound, nearby Station Petronas Batu 9).
15 October 2017
31 October 2017
10:00AM - 4:00PM & 10:00PM 5:00AM.
To facilitate the reinstatement of street lighting, permanent signage, road resurfacing (milling & pavement) and road marking works.

SBK Line
Cheras-Kajang Highway
Continuation of slip road closures at Exit 702 and Exit 703 (Kajang-bound and Kuala Lumpur-bound), Cheras-Kajang Highway.
15 October 2017
31 October 2017
10:00PM 5:00AM
To facilitate the reinstatement of street lighting, reinstatement of permanent signage, road resurfacing (milling & pavement) and road marking works.

SBK Line
Cheras Kajang Highway (Kajang Bound)
Continuation of the two -lane closure at the Cheras Kajang Highway (Kajang Bound) from Cheras Hartamas exit to Cheras Kajang Highway (Kajang bound) until slip road entering FRU Complexat Batu 7,Cheras).
15 October 2017
31 October 2017
10:00PM - 5:00AM
To facilitate the reinstatement of street lighting, reinstatement of permanent signage and road marking works.

SBK Line
PGA Interchange (Kajang and Kuala Lumpur bound)
Continuation of partial lane closure at Exit 701 at the PGA Interchange (Kajang and Kuala Lumpur bound).
15 October 2017
31 October 2017
10:00AM 4:00PM and from 10:00 PM 5:00AM.
To facilitate reinstatement of street lightings and permanent signageand road marking works

SBK Line
Cheras Kajang Highway (Kajang and Kuala Lumpur bound)
Continuation of the two-lane closure at Cheras Kajang Highway (Kajang and Kuala Lumpur bound)stretching from KM 13.3 until KM 14.7 for 1.4 km (near Kampong Sungai Raya and Taman Sri Raya).
15 October 2017
31 October 2017
10:00PM - 5:00AM
To facilitate the reinstatement of street lighting and permanent signage and road marking works.

SBK Line
Cheras-Kajang Highway
Continuation of two - lane closures at KM 14.0 until KM 15.5 for the stretch of 1.5kmon the Cheras Kajang Highway.
15 October 2017
31 October 2017
10:00PM - 5:00AM
To facilitate the reinstatement of street lighting and permanent signage and road marking works.

SSP Line
Persimpangan Putrajaya Sentral
Continuation of Long-term Lane Closures at Persimpangan Putrajaya Sentral
13 October 2017
13 April 2018
9:00am to 10:00pm & 24-hours
To facilitate road widening, traffic diversion, piloting, installation of sheet pile, TNB & CCTV relocation for MRT construction work

SSP Line
Jalan P9
Continuation of Long-term Lane Closure Along Jalan P9 Towards Putrajaya Sentral Station (North-bound)
13 October 2017
09 October 2018
24-hours
To facilitate site clearing, soil investigation, piloting, bore pile and pier construction for MRT Project

SSP Line
KL-Seremban Highway
Slip Road Closure to KL-Seremban Highway (Seremban-bound) KL - Seremban

12 October 2017
18 November 2017
10.00PM - 6.00AM
To facilitate traffic diversion, premix work, road line marking, installation of street lighting and guardrail, utilities relocation and pile cap for MRT construction works

SSP Line
Persiaran Industri (Kepong-bound)
Continuation of lane closure along Persiaran Industri (Kepong-bound) from 10 October 2017 to 24 November 2017, as per the following time:

Sunday to Friday - 10pm 6am
Saturday 10pm 10am
10 October 2017
24 November 2017
Sunday to Friday - 10pm 6am & Saturday 10pm 10am
To facilitate site clearing and tree cutting, mapping and piloting, utilities relocation and pipe jacking.

SSP Line
Jalan Jinjang Permai 2, Jalan Jambu Gajus, Jalan Kepong (Jinjang Selatan) and Jalan Kepong
Continuation of night lane closure by stages along Jalan Jinjang Permai 2, Jalan Jambu Gajus, Jalan Kepong (Jinjang Selatan) and Jalan Kepong (KL-bound & Kepong-bound).
7 October 2017
20 December 2017
10pm - 6am
To facilitate loading/unloading material and utilities relocation for MRT construction works.

SSP Line
Jalan Persiaran Pinggiran Putra & Jalan Persiaran Lestari Perdana
Intermittent lane closure at Jalan Persiaran Pinggiran Putra & at Jalan Persiaran Lestari Perdana 1.
5 October 2017
4 November 2017
10.00pm to 5.00am
To facilitate site Mapping and Piloting, Soil Investigation, Survey, Utilities Relocation and any related works.

SSP Line
Jalan Putra Permai to Jalan Persiaran Pinggiran Putra & from Jalan Persiaran Pinggiran Putra to Jalan Putra Permai (Puchong Bound)
Continuation of full slip road closure (Intermittent Night Work Only) from Jalan Putra Permai to Jalan Persiaran Pinggiran Putra & from Jalan Persiaran Pinggiran Putra to Jalan Putra Permai (Puchong Bound).
5 October 2017
4 December 2017
10.00pm to 6.00am
To facilitate site Mapping and Piloting, Soil Investigation, Survey, Utilities Relocation and any related works.

SSP Line
Jalan Kuala Selangor from Lebuhraya Damansara Puchong (LDP)
Continuation of slip road closure to Jalan Kuala Selangor from Lebuhraya Damansara Puchong (LDP) from 04 October 2017 31 October 2017, 10:00PM-6:00AM daily.
4 October 2017
31 October 2017
10:00PM-6:00AM daily
To facilitate survey works, mapping and piloting and utilities relocation for MRT construction works.

SSP Line
Jalan Sultan Azlan Shah (KL-bound & Kepong-bound)
Lane reduction and road realignment works along Jalan Sultan Azlan Shah (KL-bound & Kepong-bound), near The Maple Condominium.
3 October 2017
3 January 2018
24 hours daily
To facilitate loading/unloading material, utilities relocation and box culvert works for MRT construction works.

SSP Line
Jalan PJU10/9 & Jalan PJU10/9A
Long term lane closures along Jalan PJU10/9 and Jalan PJU10/9A .
2 October 2017
13 December 2017 (daily except Tuesdays)
8AM-6PM; 10PM-6AM
To facilitate mapping and piloting, utilities relocation and premix for MRT construction works.

SSP Line
Lebuhraya Pintasan Dengkil
Continuation of Lane Closures Along Lebuhraya Pintasan Dengkil FT29, Putrajaya (North bound and South bound)
24 September 2017
23 November 2017
7:00am to 7:00pm & 8:00pm to 6:00am
To facilitate mobilization of machineries, site clearing, soil investigation, piloting, road widening and pier construction for MRT Project

SSP Line
Jalan Putra Permai
Intermittent lane closure on the right-most lane along Jalan Putra Permai (Puchong-bound and Serdang-bound).
18 September 2017
31 October 2017
10.00PM - 5.00AM
To facilitate site Mapping and Piloting, Soil Investigation, Survey, Utilities Relocation and any related works.

SSP Line
Seri Kembangan
Long term 700-metre lane closure on the most-left lane along Jalan Putra Permai
from junction of Persiaran Akademi Perdana until the U-turn at Institut Penyelidikan Hidraulik
Kebangsaan Malaysia (NAHRIM), Serdang bound and from the U-turn at NAHRIM to the slip road
at Jalan Pinggiran Putra, Puchong bound.
14 September 2017
13 December 2017
24 hours
To facilitate Piloting, Utilities Relocation and other related works for MRT construction.

SSP Line
Jalan Kuala Selangor
Continuation of long-term one lane closure by stages for a stretch of 500 metres along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound).
1 September 2017
31 December 2017
Sunday to Friday (10:00pm 6:00am) & Saturday and public holidays (10:00pm 8:00am)
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, piloting and mapping, utilities relocation, temporary works (sheet pile and earth work), bore piling work, pile cap, and survey works for MRT construction.

SSP Line
Jalan Sultan Azlan Shah
Road realignment works and closure of right-most lane by stages along Jalan Sultan Azlan Shah (KL-bound and Kepong-bound), near Pos Malaysia.
30 August 2017
30 August 2019
24-hours
To facilitate the construction of MRT SSP Line piers.

SSP Line
Jalan Kepong
Continuation of lane closures along Jalan Kepong (Sungai Buloh-bound and Jinjang-bound).
28 August 2017
27 November 2017
11.00pm to 6.00am
To facilitate utilities detection and relocation works and tree cutting along Jalan Kepong for MRT construction works.

SSP Line
Jalan Kepong
Continuation of lane closures along Jalan Kepong (Jinjang-bound and Sungai Buloh-bound) at Desa Jaya and Pekan Lama Kepong.
28 August 2017
27 November 2017
11.00pm to 6.00am
To facilitate utilities detection and relocation for MRT construction works.

SSP Line
Jalan Kepong
Continuation of lane closures along Jalan Kepong (Sungai Buloh-bound and Jinjang-bound) for a stretch of 600 metres.
28 August 2017
27 November 2017
11.00pm to 6.00am
To facilitate utilities detection and relocation along Jalan Kepong for MRT construction works.

SSP Line
Jalan Besar Kepong
Continuation of lane closures along Jalan Besar Kepong (Sungai Buloh-bound and Jinjang-bound).
28 August 2017
27 November 2017
11.00pm to 6.00am
To facilitate utilities detection, utilities relocation and tree cutting for MRT construction works.

SSP Line
Seri Kembangan
Intermittent Lane Closures along Jalan Putra Permai Seri Kembangan
18 August 2017
18 November 2017
11:00 pm 6:00 am
To facilitate utilities piloting and other related works for MRT construction

SSP Line
Persiaran APEC
Continuation of long term lane closures along Persiaran APEC for a stretch of 600 metres.
12 July 2017
22 November 2017
Monday to Friday: 8.00am - 5.00pm
Saturday: 8.00am - 1.00pm
To facilitate site clearing, piloting, soil investigation, relocation of utilities, landscape and road widening for MRT construction works.

SSP Line
Jalan Kuala Selangor (Sungai Buloh-bound)
Continuation of a long-term traffic management plan along Jalan Kuala Selangor (Sungai Buloh-bound).
11 July 2017
31 December 2017
10:00pm 6:00am
To facilitate survey works, mapping and piloting and utilities relocation for MRT construction works.

SSP Line
Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound)
Continuation of long-term one lane closure by stages for a stretch of 500 metres along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound).
1 June 2017
31 August 2017
Sunday to Friday (10pm - 6am)
Saturday and public holidays (10pm - 8am)
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, piloting and mapping, utilities relocation, temporary works (sheet pile and earth work), bore piling work, pile cap, and survey works for MRT construction.

SSP Line
Jalan Sultan Azlan Shah (Segambut-Bound)
Long-term road realignment along a 230-metre stretch of Jalan Sultan Azlan Shah (Segambut-Bound).
1 June 2017
December 2021
24 hours daily
Construction works for MRT project

SSP Line
Jalan Kuala Selangor(Sungai Buloh & Kepong-bound)
Right-most lane closures and road realignment works along Jalan Kuala Selangor (Sungai Buloh-bound and Kepong-bound) from FHM Equipment until the exit to Sri Damansara.
20 May 2017
19 February 2018
24 hours daily
To facilitate road widening, traffic diversion, hacking of median concrete barrier and lanes realignment for construction of MRT.

SSP Line
Jalan Sultan Azlan Shah
Right-most Lane Closures And Road Alignment along Jalan Sultan Azlan Shah (KL-bound and Kepong-bound)
9 May 2017
9 May 2019
24 hours
To facilitate loading/unloading of material road realignment, platform preparation, drainage works, soil investigation, bore piling works, pier construction and launching works for construction of MRT SSP Line.

SBK Line
Jalan Sultan Azlan Shah
Long-term Road Realignment On Jalan Sultan Azlan Shah.
23 March 2017
31 December 2021
24 hours
Preparation works for the construction of the station box.

SBK Line
Jalan Cheras
Permanent slip road closure (near Caltex Petrol Station) from Taman Segar to Jalan Cheras
19 March 2017
Until further notice
24 hours
The closure is implemented as advised by DBKL for safety purposes after conducting a Road Safety Audit.

SSP Line
Jalan Kuala Selangor
Permanent Edge of the Road Closure Along Damansara Damai Before Exit to Sungai Buloh Toll (Jalan Kuala Selangor)
14 September 2016
1 July 2021
24 Hours
To facilitate site clearing and tree cutting, mapping and piloting, loading/unloading material and open guard rail, utilities relocation, road widening on Jalan Kuala Selangor and construction of bridge to future Damansara Damai MRT station

SSP Line
Jalan Kuala Selangor
Permanent Edge of the Road Lane Closure Along Jalan Kuala Selangor (Sungai Buloh-Bound)
14 September 2016
1 July 2021
24 hours
To facilitate loading/unloading material and open guard rail, site clearing and tree cutting, mapping and piloting, utilities relocation, temporary works sheet pile and earth work, bore piling work and pile cap

SSP Line
Prima Damansara
Permanent Slip Road Closure Towards Prima Damansara
18 August 2016
1 July 2021
24 hours
MRT Pier Location

SBK Line
Persiaran Surian
Re-opening of Persiaran Mahogani Intersection near Sunway Giza Mall along Persiaran Surian
31 October 2015
-
-
Completion of MRT viaduct construction works

SBK Line
PERSIARAN SURIAN NEAR TROPICANA MEDICAL CENTRE (SUNGAI BULOH-BOUND)
UPDATED TIMING FOR NIGHT ROAD CLOSURE AT PERSIARAN SURIAN NEAR TROPICANA MEDICAL CENTRE (SUNGAI BULOH-BOUND)
15 June 2015
15 August 2015
10:00pm - 5:00am (fast lane, Sungai Buloh-bound)
10:00pm - 6:30am (slow lane, Sungai Buloh-bound)
10:00pm - 5:00am (LDP-bound)
To facilitate roof construction works for Kota Damansara station

SBK Line
JALAN DUTA - SEMANTAN
CONTINUATION OF FULL NIGHT CLOSURE FROM JALAN DUTA - SEMANTAN NEAR MENARA TSH (PJ-BOUND)
13 June 2015
16 July 2015
10:00pm to 5:00am (Mon - Fri)
12:00am (Sat) to 12:00pm (Sun)
To facilitate Segmental Box Girder (SBG) launching activities

SBK Line
CHANGKAT SEMANTAN
CONTINUATION OF FULL NIGHT CLOSURE AT SLIP ROAD OF CHANGKAT SEMANTAN (PJ-BOUND)
22 May 2015
31 May 2015
10:00pm to 6:00am
To install SBG and launching works

SBK Line
Jalan Damansara (in front of Muzium Negara)
Medium-term night lane closure on Jalan Damansara (KL bound), in front of Muzium Negara.
4 May 2015
28 May 2015
10:00pm to 5:00am
Lifting works at Muzium Negara MRT construction site.

SBK Line
Persiaran Surian (LDP-bound and Sungai Buloh-bound)
Continuation of the short-term night traffic diversion at Persiaran Surian (LDP-bound and Sungai Buloh-bound) near Tropicana Medical Center.
25 April 2015
31 July 2015
10:00pm - 5:00am
To facilitate construction works for Kota Damansara station.

SBK Line
Jalan Welfare
Permanent traffic alignment at Jalan Welfare.
8 April 2015
Until further notice
24-hours daily
To enable the construction of future permanent Entrance C structure MRT Kampung Selamat Station that located on the existing road alignment.

SBK Line
Jalan Saujana Impian
Closure of temporary U-turn at Jalan Saujana Impian (nearby Saujana Impian pedestrian bridge).
15 March 2015
Until further notice
12:00am
The closure is necessary as required from the local authorities, which is after the completion of the viaducts installation works at Saujana Impian Interchange.

SBK Line
Persiaran Surian (Sungai Buloh-bound)
Temporary one(1) night contra-flow at Persiaran Surian (Sungai Buloh-bound) from the junction of Jalan Camar (near Petronas/KFC) to the junction of Jalan Teknologi (near Petronas/Maybank).
8 August 2014
-
12midnight to 5am
To facilitate relocation of launching gantry.

SBK Line
Persiaran Surian (Kota Damansara-bound)
One-night road closure at Persiaran Surian at the stretch between the traffic light junction of Jalan PJU 3/31 to the traffic light junction of Jalan PJU 5/1 (Kota Damansara-bound).
17 July 2014
-
10pm to 6am
To facilitate MRT construction works along Persiaran Surian

SBK Line
Jalan Bukit Bintang, in front of Bangunan LTAT and Menara Worldwide (Jalan Tun Razak-bound)
Reopening of stretch of road
3 June 2014
-
24 hours
-

SBK Line
Jalan Bukit Bintang (between Menara Keck Seng and Starhill Gallery)
Postponement of traffic management plan
TBA
TBA
TBA
To facilitate underground construction work

SBK Line
Jalan Bukit Bintang and Jalan Raja Chulan
Temporary road closure at a stretch of Jalan Raja Chulan (Jalan Tun Razak-bound) between Jalan Conlay and Jalan Imbi.
30 May 2014
Until further notice.
24-hours daily
To facilitate ground treatment and road rectification works.

SBK Line
Jalan Bukit Bintang
The right turn from Jalan Raja Chulan into Jalan Imbi is now open to all traffic.
15 May 2014
-
-
-

SBK Line
Jalan Raja Chulan (Tun Razak-bound)
Jalan Raja Chulan is now open to all traffic heading towards Jalan Tun Razak. Two lanes in front of Chulan Square, which were closed since 7 May 2014, are now open. Road users can now gain access to Bangunan LTAT and Menara Worldwide from Jalan Raja Chulan.
13 May 2014
-
-
-

SBK Line
Ma'arof Interchange
Opening of U-turn and slip road at Ma'arof Interchange.
15 May 2014
-
8.00am
-

SBK Line
Jalan Bukit Bintang, Jalan Raja Chulan
A stretch of Jalan Raja Chulan (Tun Razak-bound) between Jalan Conlay and Jalan Imbi has been closed to all traffic. This is a continuation to the closure of a stretch of Jalan Bukit Bintang (Pavilion-bound) in front of the Audi Showroom.
6 May 2014
Until further notice.
24-hours daily
Road rectification works.

SBK Line
Jalan Sultan Ismail
Temporary night lane closure at Jalan Sultan Ismail, located in front of Lot 10 shopping mall.
2 May 2014
-
10:00pm to 5:00am
To facilitate road resurfacing work for the MRT Underground construction works.

SBK Line
Jalan Bukit Bintang (Jalan Tun Razak-bound)
Road closure at the stretch of Jalan Bukit Bintang (Jalan Tun Razak-bound) between Chulan Square and the Jalan Tun Razak intersection.
26 April 2014
Until further notice
24 hours daily
Road repair works

SBK Line
Jalan Bukit Bintang (Jalan Tun Razak-bound)
Immediate closure of Jalan Bukit Bintang between Chulan Square and Menara Worldwide (500m stretch).
23 April 2014
Until further notice
24 hours daily
Road repair works

SBK Line
SPRINT Highway (KL-bound)
The right-most and middle lanes at the Sprint Highway (KL-bound), between Bukit Kiara Interchange and the Jalan Setiapuspa junction will be realigned to the newly constructed lanes on the left.
16 April 2014
Until further notice
24-hours daily
To facilitate hacking work, boring, concreting, pile cap and pier construction works located at the median of the Sprint Highway, in preparation for the construction of MRT piers.

SBK Line
Jalan PJU 5/8 into Persiaran Surian
Motorists intending to exit from Jalan PJU 5/8 into Persiaran Surian will no longer be able to turn left at the junction of PJU 5/13. Motorists will be diverted to turn right at the PJU 5/13 junction, another right into Jalan PJU 5/9, and then into Jalan PJU 5/7 to join Persiaran Surian.
5 April 2014
Until further notice
24-hours daily
To facilitate MRT construction works.

SBK Line
Pedestrian walkway which starts from Sunway Nexis to Pelangi Square (LDP-bound)and between Pelangi Damansara to BU4 area (Dataran Sunway-bound).
Pedestrians using the walkway on either side of Persiaran Surian who wish to cross to the other side, may use the overhead pedestrian bridge at Pelangi Square/Pelangi Damansara. Zebra crossings will also be provided for this purpose.
Ongoing
Until further notice
24-hours daily
To facilitate the construction of MRT piers.

SBK Line
Sprint Highway/Jalan Semantan (PJ-bound)
There will be a one night closure of the Istana Pintu 2 ramp at Sprint Highway/Jalan Semantan (PJ-bound). A certain level of noise and vibration is expected during this period.
28 February 2014
-
10.00pm to 6:00am
To safeguard public safety during the removal of a signboard gantry, located near the Jalan Damansara Endah/Jalan Semantan junction.

SBK Line
In front of IPC, Persiaran Surian
Realignment of traffic lanes in front of IPC, Persiaran Surian
11 March 2014
-
24 hours
Construction of MRT piers

SBK Line
Sprint Highway between Jalan Setiapuspa & Wisma Lensa
Realignment of traffic at Sprint Highway between Jalan Setiapuspa and Wisma Lensa (KL-bound)
7 December 2013
-
24 hours
Pier construction works

SBK Line
Jalan Tun Mohd Fuad, Taman Tun Dr Ismail
Narrowing of a single lane at Jalan Tun Mohd Fuad, Taman Tun Dr Ismail for a stretch of 30 metres.
13 November 2013
Until further notice
24 hours
To facilitate preparation works for the construction of MRT piers and MRT Taman Tun Dr.Ismail Station.

SBK Line
SPRINT HIGHWAY, Jalan Setia Puspa
SPRINT Highway will undergo a full closure (KL-bound) from the exit of Jalan Setia Puspa towards the exit to Jalan Johar.
10 October 2013
Until further notice
12am to 5am
To facilitate the removal of gantry which is located between Victoria Station Restaurant and Wisma Lensa

SBK Line
Persiaran Surian
Closure of traffic light junction at Persiaran Surian into PJU 5/1.
9 October 2013
Until further notice
24 hours
To allow the construction of MRT piers at this stretch.

SBK Line
Jalan Damansara
The U-turn at Jalan Damansara into LDP will be permanently realigned (returning to Kuala Lumpur direction)

The U-turn which is currently located before the traffic light junction into LDP will be shifted to the traffic light junction.
13 July 2013
Until further notice
All day
To allow the construction of MRT piers

SBK Line
Jalan Damansara, Jalan Wan Kadir 3
Closure of traffic lights at the junction of Jalan Damansara & Jalan Wan Kadir 3.
23/05/2013
Until further notice
All day

SBK Line
Jalan Bukit Bintang
Partial closure of pedestrian crossing at Jalan Bukit Bintang, located between the Yayasan Selangor building and McDonald's restaurant.
15 May 2013
December 2016
All day

SBK Line
Jalan Bukit Bintang between intersection with Jalan Sultan Ismail and intersection with Jalan Bulan, Kuala Lumpur
Road Realignment
15 Oct 2012
Early 2014
All day
Construction work

SBK Line
Jalan Tong Shin off Jalan Bukit Bintang, Kuala Lumpur
Road Realignment
15 Sep 2012
End of 2015
All day
Construction work

SBK Line
Jalan Damansara in front of Muzium Negara, Kuala Lumpur
Road Realignment
22 Aug 2012
Sep 2014
All day
Construction work

Alternative Route

Alternative routes to avoid MRT construction

Description
Type
Download

SBK Line
Alternative routes for Jalan Cheras road closures
General

SBK Line
Alternative routes for Jalan Semantan to Kota Damansara road closures
General

SBK Line
Alternative For Lebuhraya Damansara-Puchong (LDP), Jalan Damansara
General

SBK Line
ALTERNATE ROUTE JALAN DAMANSARA
General

SBK Line
ROADS DURING CONSTRUCTION- NORTHERN
General

SBK Line
ROADS DURING CONSTRUCTION- CITY CENTER
General

SBK Line
ROADS DURING CONSTRUCTION- SOUTHERN
General

SBK Line
ALTERNATIVE ROUTES SG BULOH- CITY CENTRE (NORTHERN)
Area Wide

SBK Line
ALTERNATIVE ROUTES CITY CENTRE
Area Wide

SBK Line
ALTERNATIVE ROUTES CITY CENTRE- KAJANG (SOUTHERN)
Area Wide

SBK Line
ALTERNATIVE ROUTES BALAKONG - SG LONG- KAJANG
Sectional Alternative Routes

SBK Line
ALTERNATIVE ROUTES CHERAS-BALAKONG-SG LONG
Sectional Alternative Routes

SBK Line
ALTERNATIVE ROUTES CITY CENTRE-CHERAS
Sectional Alternative Routes

SBK Line
ALTERNATIVE ROUTES KOTA DAMANSARA- TTDI
Sectional Alternative Routes

SBK Line
ALTERNATIVE ROUTES MUTIARA DAMANSARA- PUSAT BANDAR DAMANSARA
Sectional Alternative Routes

SBK Line
ALTERNATIVE ROUTES SG BULOH- KOTA DAMANSARA
Sectional Alternative Routes

SBK Line
ALTERNATIVE ROUTES TTDI- CITY CENTRE
Sectional Alternative Routes


Export

Back to Top

 
Copyright © 2017 Mass Rapid Transit Corporation Sdn Bhd.(902884V) All Rights Reserved. Privacy Policy